Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55 <br /> Page 4 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Improvements Requiring Assessment <br /> Piney Mountain Subrlivision <br /> 8) Provide boundary survey of existing nitrification fields and <br /> repair area. <br /> Boundary Survey 8095 IF @ .50 4047.50 <br /> rM #7 TOTRL: $4047.50 <br /> 8) Check and pump acctmulated residuals from individual septic and <br /> pump tanks (STEPS}. Repipe effluent pump to provide maintenance <br /> and repair from ground surface. Provide approved for pump, <br /> controls and alarm adjacent to pump chamber. Install proper access <br /> risers and covers to septic and pump tanks as required by local health <br /> department. Provide separate electrical circuit for pump alarm. <br /> Materials 6841 .89 <br /> Equipment & Labor 7738.50 <br /> STEP Pumping (33 @ 145.00/ea) 4785.00 <br /> T= 08 VOOL: $19365.39 <br /> 9) Provide all weather access to Phase Z1 dosing tank and maintersaruu a access <br /> to field areas. Remove bah and debris left on site by North State <br /> Utilities. <br /> Materials: <br /> ABC Stone (4" thick) 70 TN @ 10.50 735.00 <br /> Dump Fears (cleating debris) 450.00 <br /> 15" Ate' 40 IF @ 8.60 344.00 <br /> Egu�_IAbour: <br /> Fra�tt�—I --- - 16 hrs @ 70.00 1120.00 <br /> Skilled Lsbu:ar 16 hrs @ 15.00 240.00 <br /> Bobcat LoadW 6 hrs @ 35.00 210.00 <br /> Dump, Truk 16 hrs 8 30.00 480.00 <br /> Backhos 4 hrs @ 45.00 180.00 <br /> I= 09 Togua $3759.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.