Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
54 <br /> M <br /> Page 3 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Improvements Requiring Assessment <br /> Piney Mountain Subdivision <br /> 4) Replace all existing irrigation type solenoid valves at Phase I drain <br /> field with suitable "contaminant resistant" (effluent rated) valves, <br /> including the provision of in4epesx3snI ball valve for isolation and gate <br /> valve for flow control and flow sensing device. Valve assembly shall <br /> be installed in suitable enclosures such that normal foot traffic and <br /> mowing equipment may pass over them without injury to either enclosure <br /> or equipment, while providing sufficient room to repair and adjust the <br /> valves. <br /> 17 valve assemblies @ 530.00 ea. <br /> Materials 4420.00 <br /> Equipment & Labor 4590.00 <br /> ti <br /> r= 04 TOTAL: $ 9010.00 <br /> 5) Locate and adjust to elevation acceptable to local authority all <br /> "turn-up" pipes at act of laterals in Hum I drainfield and provide <br /> physical protection for those "turn-ups". <br /> 178 "turn-ups" @ $9.50 ea. <br /> Materials 890.00 <br /> Equipment & Labor 801 .00 <br /> 05 WJML: $1691.00 <br /> 6) Provide and install such additional soil material as may be <br /> necessary to smooth surface contour of Phase I field areas so that <br /> surface water pondin9 and trench settling are eliminated. Seeding <br /> and mulching of all disturbed areas. <br /> Removal of Pine Stray Omw 1.73 AC @ 2000.00 3460.00 <br /> Furnish & Install Topsoil Fill 300 CY @ 22.50 6750.00 <br /> Seeding & Mulching 2.16 AC @ 1650.00 3564.00 <br /> T'®! <br /> 06 1 ZK.- $13774.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.