Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br /> Page 2 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Ltrprovemants Requiring Assessment <br /> Piney Mountain Subdivisixaat <br /> 1 ) Provide all weather access to Phase I dosing tanks and maintenance access <br /> to field areas. Remove brush and debris left on site by North State <br /> Utilities. <br /> Materials: <br /> ABC Stone (4" thick) 3.9 TN @ 10.50 404.50 <br /> Dump Fees(Clearing debris) 150.00 <br /> Equipment & Labor: <br /> Tractor w Blade 3 hrs @ 30.00 40.00 <br /> Skilled Tabor 5 hrs @ 15.00 75.00 <br /> Bobcat ? 5 hrs @ 35.00 175.00 <br /> Dump Tnick 5 hrs @ 30.00 150.00 <br /> I <br /> rM 1 TOTAL: $1049.50 <br /> 2) Repipe existing pumps in Phase I dosing tanks to allow for prrMr <br /> maintenance access, provide appa:opriate isolation valves for each pub, <br /> provide proper disconr:arct for pumps and floats adjacent to dosing tank, <br /> replace existing float switches, install non-cxu%=ive float bracket, <br /> replace existing controls with new M sated duplex control panel having <br /> suitable control logic to provide for reliable automatic and manual <br /> operation of control valves and valve-specific an-uciaticn of improper <br /> operation of any given valve. New control panel will include event <br /> and time aazsnulators for each control zone. Replace inoperable <br /> telephone dialer. <br /> Materials 20070.00 <br /> Equipment & Lebar 584.00 <br /> Electric 2420.00 <br /> MM 02 TOM",, $23074.00 <br /> 3) Raise buried access covers to additional "Phase V dosing tank to <br /> around surface. <br /> Raise Buried Covers: (2' dia. riser wlccr=ete lids) <br /> via l�s 910.00 <br /> Equipment & Labor 1104.00 <br /> Imo! 03 TOTAL: INI4.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.