Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52 <br /> HARRCO <br /> UTILITY CORPORATION <br /> December 1 , 1993 "�!-�y <br /> Robert H. Bennink, Jr., General Counsel 199; <br /> North Carolina Utilities Conaission <br /> P.O. Box 29510 CLEPK <br /> Raleigh, NC 27626-0510 L7F <br /> S Cp 4'MIS3��y <br /> RE: Docket No. W-848, Sub . -16 <br /> Capital Improvements Requiring Assessment <br /> Piney Mmzxtx3n Subdivision <br /> Dear Mr. Bennlnk. <br /> In order to comply with ordering paragraph number nine of the "Reccw*nde3 <br /> Order Appointing Emergency Operator and Approving Interim Rate", issued September <br /> 1, 1993 by the commission in the above referenced docket, Harrco Utility <br /> Corporation (HUC) has contracted with Mr. James R. Butler, a professional engineer <br /> with the firm of Bass, Nixon and Kennedy, Inc. Mr. Butlers' duties are to aid <br /> HUC in determining the improvements necessary to bring the existing North State <br /> Systems into an acceptable working order. <br /> Mr. Butler has worked closely with HUC personnel and local health officials <br /> in making site visits and inspections in order to assess the condition of the <br /> North State Systems. Attached to this letter, is a copy of his findings and <br /> recommendations relating to the North State System serving the Piney Mountain <br /> Subdivision. <br /> At the request of HUC, Mr. Tom Konsler of the Orange County Health <br /> Department conducted an inspection of the system serving the Piney Mountain <br /> Subdivision. Attached to this letter, is a copy of his findings dated <br /> October 29, 1993. <br /> After review of threw two reports and compilation of operating data by our <br /> staff since September 1, 19930, Harrco Utility Corporation formally re=wands <br /> the following repairs and impravenants be performed as a minimum in order to bring <br /> this system into an acceptable working order that can be maintained and operated <br /> with reasonable effort and safety to the operating personnel. <br /> 8601 Barefoot Industrial Road Raleigh, NC 27613 • (919) 782.3440 <br />
The URL can be used to link to this page
Your browser does not support the video tag.