Orange County NC Website
ARTICLE 4 <br /> CONTRACT SUM <br /> 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of <br /> (s One Hundred Ninety Three Thousand Nine Hundred and Twenty. . . . . . . . . . . . . . . . . Dollars <br /> 93,920.00 ), subject to additions and deductions as provided in the Con- <br /> tract cements. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br /> hereby accepted by the Owner: <br /> (State the numbers or other identification of accepted alternates.If decisions on other alternates are to be made by the Owner subsequent to the execution of <br /> this Agreement,attacb a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) <br /> None <br /> 4.3 Unit prices, if any, are as follows: <br /> UNIT PRICE BASE BID QTY <br /> 1 . 2" x 4" Treated Wood Replacement �__1 .25/LF <br /> 2. 2" x 6" Treated Wood Replacement $ 1 .50/LF <br /> 3. 2" x 8" Treated Wood Replacement $ 1 .75/LF <br /> 4. 2" x 10" Treated Wood Replacement $ 2.00/LF <br /> 5 . Walk Tread (as recommended by $ 3.00 1SF Approx. 100 LF <br /> manufacturer) <br /> 6. Install new 3" Josam 21500 series $ 500.00/EA <br /> 7. Install 3" schedule 40 PVC insulated $ 25.00/LF <br /> leader <br /> 8. New Gutter (as specified) $ 10.00/LF 2,100 LF <br /> 9. Downspout (as specified) $ 8.00/LF 400 LF <br /> 10. Deck Replacement (as specified) $ 6.50/ SF 200 SF <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT• TWELFTH EDITION • AIA� • ©198- <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1731 NEW PORK AVENUE.N W.,WASHINGTON.D.C._WX) A101-1987 3 <br />