Browse
Search
1994 S Purchasing - Guaranteed Systems, Inc. for the replacement of the roof at Northern Human Services Center in Cedar Grove
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1994
>
1994 S Purchasing - Guaranteed Systems, Inc. for the replacement of the roof at Northern Human Services Center in Cedar Grove
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 2:18:25 PM
Creation date
1/26/2015 2:17:41 PM
Metadata
Fields
Template:
BOCC
Date
1/4/1994
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-B
Document Relationships
Agenda - 01-04-1994-IX-B
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1994\Agenda - 01-04-94 Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 4 <br /> CONTRACT SUM <br /> 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of <br /> (s One Hundred Ninety Three Thousand Nine Hundred and Twenty. . . . . . . . . . . . . . . . . Dollars <br /> 93,920.00 ), subject to additions and deductions as provided in the Con- <br /> tract cements. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are <br /> hereby accepted by the Owner: <br /> (State the numbers or other identification of accepted alternates.If decisions on other alternates are to be made by the Owner subsequent to the execution of <br /> this Agreement,attacb a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) <br /> None <br /> 4.3 Unit prices, if any, are as follows: <br /> UNIT PRICE BASE BID QTY <br /> 1 . 2" x 4" Treated Wood Replacement �__1 .25/LF <br /> 2. 2" x 6" Treated Wood Replacement $ 1 .50/LF <br /> 3. 2" x 8" Treated Wood Replacement $ 1 .75/LF <br /> 4. 2" x 10" Treated Wood Replacement $ 2.00/LF <br /> 5 . Walk Tread (as recommended by $ 3.00 1SF Approx. 100 LF <br /> manufacturer) <br /> 6. Install new 3" Josam 21500 series $ 500.00/EA <br /> 7. Install 3" schedule 40 PVC insulated $ 25.00/LF <br /> leader <br /> 8. New Gutter (as specified) $ 10.00/LF 2,100 LF <br /> 9. Downspout (as specified) $ 8.00/LF 400 LF <br /> 10. Deck Replacement (as specified) $ 6.50/ SF 200 SF <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT• TWELFTH EDITION • AIA� • ©198- <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1731 NEW PORK AVENUE.N W.,WASHINGTON.D.C._WX) A101-1987 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.