Browse
Search
1994 S Purchasing - Guaranteed Systems, Inc. for the replacement of the roof at Northern Human Services Center in Cedar Grove
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
1990's
>
1994
>
1994 S Purchasing - Guaranteed Systems, Inc. for the replacement of the roof at Northern Human Services Center in Cedar Grove
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 2:18:25 PM
Creation date
1/26/2015 2:17:41 PM
Metadata
Fields
Template:
BOCC
Date
1/4/1994
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
IX-B
Document Relationships
Agenda - 01-04-1994-IX-B
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1994\Agenda - 01-04-94 Regular Mtg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T H E A M E R I C A N I N S T I T U T E O F A R C H I T E C T S <br /> DATE .-.Lz.�/, F <br /> aTEM ORIGINAL <br /> AIA Document A101 <br /> Standard Form of Agreement Between <br /> Owner and Contractor <br /> where the basis of payment is a <br /> STIPULATED SUM <br /> 1987 EDITION <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH <br /> AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. <br /> The 1987 Edition of AIA Document A201, General Conditions of the Contract for Construction, is adopted <br /> in this document by reference. Do not use with other general conditions unless this document is modified. <br /> This document has been approved and endorsed by The Associated General Contractors of America. <br /> AGREEMENT <br /> made as of the . Fo Ar*4, L'� day of January in the year of <br /> Nineteen Hundred and Ninety Four <br /> BETWEEN the Owner: Orange County <br /> (Name and address) 132 East King ' Street <br /> Hillsborough, NC 27278 <br /> and the Contractor: Guaranteed Systems, Inc. <br /> (Name and address) P. 0. Box 780 <br /> Stoneville, NC 27048 <br /> The Project is: Northern Center <br /> (Name and location) Hwy 86 N. <br /> Hillsborough, NC <br /> The Architect is: RTD Associates, P.A. <br /> (Name and address) 5500-117 Executive Center <br /> Charlotte, NC 28212 <br /> The Owner and Contractor agree as set forth below. <br /> Copyright 1915, 1918, 1925. 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, ©1987 by The American Institute of Archi- <br /> tects, 1735 New York Avenue,N.W.,Washington, D.C.20006. Reproduction of the material herein or substantial quotation <br /> of its provisions without written permission of the AIA violates the copyright laws of the United States and will he subject to <br /> legal prosecution. <br /> AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT • TWELFTH EDITION • AIAa • Q 19H' <br /> THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEVI'YORK AVENUE,N.%'.,WASHINGTON.D.C.2(XMXi A101-1987 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.