Browse
Search
Agenda - 01-04-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-04-94 Regular Mtg.
>
Agenda - 01-04-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2015 8:50:17 AM
Creation date
1/26/2015 8:50:06 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940104
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> B. Southern Human Services Center <br /> The architect has been working with the proposed resident departments <br /> of the Southern Human Services Center for several months. It became <br /> apparent in these meetings that space requests were likely to exceed <br /> the amount that could be built within the existing budget. Although <br /> the departmental requests still exceed the original programming <br /> estimate of 30, 000 square feet, it appears that program space can be <br /> pared to this level without sacrificing essential programs. <br /> A summary of the space allocations for this facility are shown at <br /> Attachment 2 . <br /> The charts below depict the cost break-down and additional funding <br /> necessary if the corresponding square footage is built. All of this is <br /> based on the educated speculation from the architect that the building <br /> can be constructed for $65/square foot, which within the current budget <br /> would construct a 23, 100 square foot building. <br /> A breakdown of estimates for projected expenses of the project are as follows: <br /> Land $ 962,500 <br /> Design fees 356,320 <br /> Reimbursables associated with design fee 20,000 <br /> Site Work (access road, parking lot <br /> development, etc.) 400,000 <br /> OWASA Impact fees 50,000 <br /> Misc. Owner responsibilities <br /> Includes survey, geo-technical work, <br /> unsuitable soils allowance, etc.) 40,000 <br /> Sub Total of expenses without construction of building costs $1,828,820 <br /> Amount available for projects $3,382,500 <br /> Amount available for construction of building $1,553,680 <br />
The URL can be used to link to this page
Your browser does not support the video tag.