Orange County NC Website
~II~At~i~lE ®1~-IEfl~ <br />(`instructions ors reverse side) No, _ Two ~ 2 ) <br />PROJECT: Sanitary Sewer for Orange County DATE OF ISSUANCE: January IS, 2008 <br />Landfill <br />OWNER: Orange County <br />Solid Waste Management <br />~~e' Post Office Box 17177 <br />Address) Chapel Hill, NC 27516-7].77 <br />CONTRACTOR: <br />CONTRACT FOR: Design/Construction Services <br />for Sanitary Sewer Mains <br />OWNER's Project No. <br />ENGINEER: Philig Post and Associates, Inc. <br />401 Providence Road~tz22 <br />Chapel Hill, NC 27514 <br />ENGINEER's Project No. 300302 <br />Descrigtion <br />ADD. 1. Sewer Easement negotiations with Mr. & Mrs. John Tran in May, June, July that led <br />to atr,;impass $2,740.00 <br />2. Work with County Attorney on various tasks in suppport of condemnation for sewer, <br />water, drainage and slope easements on Tran. $2,17b.00 <br />',3. Prepare Easment plats for water, slo a and drainage easements needed to construct <br />'the Orange County Animal Shelter. 2,859.00 <br />4. As required byy George Small, P.E. Town Engineer, redesign of sewer under railroad. <br />and under Millhouse Road to satisfy Town of Chapel Hill: $8,225.00 <br />Prepare Change Order: To conform to requirements of Town of Chapel Hill and obtain easement <br />for both the Sewer Project and the Orange County Animal Shelter Project. <br />CHANGE IN CONTRACT PRICE: <br />Original Contract Price <br />~ X7,040.04 CHANGE IN CONTRACT TIME: <br />Original Contract Time <br />N/A <br /> days ardam <br />Previous Change Orders No. One to No. <br />~ 8,260.00 Net change from previous Change Orders <br />N/A <br /> days <br />Contract Price prior to this Change Order <br />~ 105:260.00 Contract Time Prior to this Change Order <br />N/A <br /> days or data <br />Net Increase (decrease) of this Change Order <br />~ 16,040.00 Net Increase (decrease) of this Change Order <br />N/A <br /> days <br />Contract Price with ali approved Change Orders <br />$ 121,260.40 .Contract Time with all approved Change Orders <br />N/A <br />~~~~ ,~' days ar date <br />-- - -- _ <br />~ ~P <br />tea.. 1~PP ~QVED: APPROVED: <br />n <br />~3 <br /> <br />by N/A ' <br />contractor <br />EJCDC No. 19I0-8-B (1983 <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by T'he Associated General Contractors of America. <br />nmrinCixl SdS ' <br />