Browse
Search
Agenda - 01-27-2015 - 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 01-27-2015 - Work Session
>
Agenda - 01-27-2015 - 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2015 2:06:54 PM
Creation date
1/23/2015 11:17:48 AM
Metadata
Fields
Template:
BOCC
Date
1/27/2015
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 01-27-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br />• Phase I - <br />$2.4 million: <br />Improvements to Ephesus Church @ Fordham (West Bound) <br />• Phase II - <br />4.0 million: <br />Improvements to Fordham Road @ U -Turn (Superstreet) <br />• Phase III - <br />1.3 million: <br />Improvements at Fordham Road @ Elliot Road <br />• Phase IV - <br />1.1 million: <br />Multimodal connection between Elliot Road & Willow Dr. <br />Total <br />$ 8.8 million <br />• Stormwater Improvements: As part of the SAP study, Kimley -Horn & Associates <br />conducted a detailed storm water study for the area. As a result of that study and <br />subsequent analysis it was determined that the technical standards for stormwater will be <br />applied to the district as a whole and implemented when each parcel is developed or <br />redeveloped. In order to help address existing water quality and water quantity issues, <br />the Jordan nutrient treatment requirements would also apply to sites that that do not <br />increase impervious surface as a result of redevelopment. The planned $1.2 million in <br />capital funding will be used for up- stream stormwater improvements. <br />The Town also plans to create a Municipal Service District to collect a tax for <br />management of the stormwater facilities in the district. The district tax, if established at <br />the planned rate of 4 cents, would generate about $60,000 per year based on current <br />assessed values. Stormwater management planning for this project is ongoing and there <br />may be changes to some of the elements described above to improve the effectiveness of <br />the plan. <br />The Financing Plan <br />The total cost of the planned public improvements is $10.0 million ($8.8 million for traffic <br />improvements and $1.2 million for Stormwater). The Town plans on issuing debt to finance the <br />capital cost for these public improvements. The most efficient and cost effective way for the <br />Town to finance this project is to coordinate the financing with other projects that can provide <br />collateral for a combined financing. <br />The Town is planning on financing the Town Hall Renovation project and other CIP projects <br />with debt. By combining the financing of these projects using two- thirds bonds and an <br />installment financing using the Town Hall as collateral, the total cost of financing these projects <br />will be reduced and can be completed on the timetable established for the Ephesus Fordham <br />Proj ect. <br />The Projects <br />Town Hall Repair & Renovation $ 900,000 <br />High Priority CIP Projects 800,000 <br />Ephesus Fordham: <br />Traffic Improvements 8,800,000 <br />Stormwater Capital 1,200,000 <br />Total Ef Project 10,000,000 <br />Total All Projects 11,70 0.00 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.