Orange County NC Website
January 21, 2015 Attachment C 10 <br />• 2040 MTP: U.S. 15 -501 from Ephesus Church Road to Columbia <br />Street: Capacity improvements and possible interchange at Manning Drive <br />with sidewalks, wide outside lanes and transit accommodations. <br />• 2012 -2018 DCHC MPO TIP Projects: U -5304 — US 15 -501, NC 86 (South <br />Columbia Street) to SR 1742 (Ephesus Church Road): Sidewalks, wide <br />outside lanes and transit accommodations, but no intersection improvements. <br />Programmed for construction in FY 2019 (TIP developmental program) at a <br />cost of $5,150,000. This project is subject to reprioritization. <br />• SPOT 3.0 Reprioritization: <br />• U.S. 15 -501 from Ephesus Church Road to Columbia Street: Capacity <br />improvements and possible interchange at Manning Drive with sidewalks, <br />wide outside lanes and transit accommodations. A feasibility study is <br />currently underway that should better define the project and lower the cost <br />estimate. The project scores well in the Statewide Mobility funding <br />category. The MPO did not assign local input points to the project and <br />recommended waiting to see if the project gets funded from the Statewide <br />Mobility category for the next TIP development iteration while the <br />feasibility study is underway. The current project cost estimate is <br />$95,330,000. The project received a Statewide Mobility score of 44.55, <br />which is just below the estimated funding cut -off of 45 minimum points. <br />The STIP Statewide Mobility Category will score better if feasibility study <br />shows the estimated cost to be less than the $95,330,000. <br />• U.S. 15 -501 at Ephesus Church Road: Intersection improvements. Cost of <br />$2,170,000. Scored well in Statewide Mobility funding tier and looks to be <br />funded with approval by the MPO. The proposed schedule for the project <br />is right -of -way in FY 2023 and construction in FY 2024. There has been <br />some discussion of Chapel Hill accelerating the project and looking at the <br />possibility of being reimbursed when the project is programmed in the <br />STIP. <br />Note: This acceleration has been recommended by the DCHC MPO board in mid - <br />November 2014. <br />Orange County Summary of Recommendations for a Study to Examine Building a <br />Transit Infrastructure for Economic Development in Orange County <br />• Fund a study to review whether the recommended circulator shuttle for the Study <br />Area, and the extension of the OPT of the extension of the OPT 420 bus route <br />would further the primary plan objectives, and develop estimated costs. <br />• BRIP amendment to include a circulator shuttle connecting the Study Area with <br />downtown Chapel Hill, UNC Campus dorms, Carolina North. <br />• BRIP amendment to include extension of the OPT 420 bus route connecting the <br />Study Area with rural Orange County and Hillsborough via the circulator shuttle. <br />• BRIP amendment to include installation of one or two BRT routes to <br />accommodate the circulator shuttle. <br />M <br />