Browse
Search
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:31:12 PM
Creation date
1/23/2015 9:57:07 AM
Metadata
Fields
Template:
Contract
Date
1/23/2015
Contract Starting Date
1/20/2012
Contract Ending Date
1/31/2017
Contract Document Type
Agreement - Interlocal
Agenda Item
12/1/14; 7-c
Document Relationships
Agenda - 12-01-2014 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 12-01-2014 - Regular Mtg.
R 2015-113 Planning - City of Durham - Amendment to Interlocal Agreement bet. OC and City of Durham re construction/operation of water/sewer facilities
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br /> _Please return this copy to the Clerk 3 <br /> Attachment 1 office for permanent agenda files d4ly otard,'cs� <br /> INTERLOCAL AGREEMENT <br /> BETWEEN ORANGE COUNTY AND THE CITY OF DURHAM <br /> FOR CONSTRUCTION AND OPERATION OF WATER AND SEWER FACILITIES <br /> IN THE ENO ECONOMIC DEVELOPMENT ZONE OF ORANGE COUNTY <br /> alt, <br /> This agreement is dated,made,and entered into as of the day of , <br /> 20 JA,by the City of Durham,a North Carolina municipal corporation('Durham)and Orange <br /> County, a North Carolina political subdivision("Orange"). <br /> Purposes. The purposes of this agreement are(1)to further the economic development potential of land <br /> identified by Orange County and the City of Durham in their respective.planning documents as <br /> particularly suitable for industrial development,as well as to promote the public health and safety of <br /> residents within the area,and(2)to accomplish the design,construction,and operation of water and sewer <br /> services within the Eno Economic Development District. <br /> 1. Definitions <br /> Year—July 1—June 30 <br /> Zone—The Eno Economic Development District located at the eastern boundary of <br /> Orange where U.S.Highway 70 and Interstate Highway 85 intersect,shown in greater <br /> detail by the map titled"Eno Economic Development Zone Utility Service Boundary" <br /> and attached as Exhibit A. The Zone does not include land in Durham County. <br /> 2. Desi . Durham will solicit and receive proposals for the design of water and sewer <br /> infrastructure to serve the Zone.Before awarding contracts for such design,Durham will <br /> provide Orange with the proposals and other responses to the request for proposals so that <br /> Orange may review and comment to Durham regarding the selection of the designer(s). <br /> Durham will then proceed to negotiate the professional fees with the designer(s). The fees <br /> must be satisfactory to Orange. Durham will not select any designer to which Orange obj ects <br /> based on the qualifications and/or professional fees. If Orange does not object within a <br /> reasonable time to a designer and its proposed fee structure,Durham may award a contract to <br /> the designer for such design in which the proposed fee structure applies. Orange will <br /> reimburse Durham for all payments that Durham is required to pay under the contracts. <br /> Therefore,Durham will invoice Orange as invoices are received from the selected <br /> designer(s)for payments made or required to be made under the design contracts. Orange <br /> will pay each invoice within thirty(30)days after it receives it. <br /> 3. Construction. Durham will solicit bids for the construction of the infrastructure. Durham will <br /> share the proposals with Orange. Orange may comment to Durham as to which contractor(s) <br /> the award should be made. If Durham concurs, and if Durham determines it appropriate to <br /> do so,Durham will award the contract(s)to those contractor(s)and execute contract(s)with <br /> them. If Durham does not concur,or if Durham otherwise finds it appropriate to rebid, <br /> Durham will rebid and continue the process described in this paragraph until Durham makes <br /> an award unless the Durham City Manager and the Orange County Manager jointly agree to <br /> suspend or abandon the process. By authorizing their respective managers to sign this <br /> agreement,the parties' governing bodies authorize them to agree to suspend or abandon the <br />
The URL can be used to link to this page
Your browser does not support the video tag.