Browse
Search
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-113 Planning - Amendment to Interlocal Agreement between OC-City of Durham, Construction-Operation of Water-Sewer Facilities in the Eno ED Zone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:31:12 PM
Creation date
1/23/2015 9:57:07 AM
Metadata
Fields
Template:
Contract
Date
1/23/2015
Contract Starting Date
1/20/2012
Contract Ending Date
1/31/2017
Contract Document Type
Agreement - Interlocal
Agenda Item
12/1/14; 7-c
Document Relationships
Agenda - 12-01-2014 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 12-01-2014 - Regular Mtg.
R 2015-113 Planning - City of Durham - Amendment to Interlocal Agreement bet. OC and City of Durham re construction/operation of water/sewer facilities
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1 • Introduction <br /> 1.3 Scope of Study <br /> The scope of work for this master plan was developed by CDM Smith,City,and County staff and 17 <br /> consists of the following primary tasks: <br /> ■ Flow and Demand Projgctions <br /> • Proposed Water and Wastewater Infrastructure within Eno EDD <br /> • Force Main Discharge Alternatives <br /> ■ Permit Agency Coordination <br /> ■ Cost Estimates i <br /> • Master Plan Report <br /> A brief description of each task follows. <br /> Flow and Demand Projiections <br /> The purpose of this task was to utilize available zoning and planned-development data to develop <br /> water demand and wastewater flow projections within the Eno EDD,which in turn would be used to <br /> layout the proposed water and wastewater infrastructure backbone. <br /> Proposed Water and Wastewater Infrastructure within Eno EDD <br /> The purpose of this task was ti)develop a conceptual layout of the recommended water distribution, <br /> wastewater collection,and wastewater pump station and force main infrastructure within the Eno <br /> EDD.A combination of wastewater flow/water demand projections and physical site characteristics, *� <br /> such as topography,streams,and roads,were used to layout the proposed infrastructure that would <br /> serve as the backbone of the system. <br /> Force Main Discharge Alternatives <br /> The purpose of this task was tb identify and evaluate various alternatives for Where the wastewater <br /> flow generated within the Eno EDD could be discharged into the City's wastewater collection and <br /> conveyance system.The location of the Eno EDD basin is such that the wastewater flow could <br /> i <br /> potentially be discharged into either one of the City's two water reclamation facility(WRF)basins,the <br /> North Durham WRF or the South Durham WRF.There are three potential outfalls the Eno EDD flow <br /> could be discharged to: <br /> ■ North Durham WRF Basin <br /> i <br /> The Eno Outfall,which is located in the Eno Basin <br /> -The Ellerbe Creek Outfall,which is located in the North Durham Basin <br /> ■ South Durham WRF Baain <br /> -The Mud Creek Outfall,which is located in the Farrington Basin <br /> For the purposes of this report,the three potential discharge locations will be referred to as the Eno <br /> Outfall,Ellerbe Creek Outfall,and Mud Creek'Outfall. <br /> 1-2 Vfflb1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.