Browse
Search
Agenda - 01-22-2015 - 6i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 01-22-2015 - Regular Mtg.
>
Agenda - 01-22-2015 - 6i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2018 10:19:09 AM
Creation date
1/16/2015 3:11:59 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-j
Document Relationships
2017-364 Planning - Seven Mile Farms, LLC - Offer to Purchase and Contract
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 01-22-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOCC Exhibit - Buckhorn Mebane EDD, Efland Sewer to Mebane, Phase 2 Extension (Sheet 14of 2) <br />Project Area <br />Existing Force Main Proposed Gravity Sewer <br />8" � 8" <br />10" .■IIIIIIIIIIIII■ 12" <br />FORREST <br />Add Alt #1 <br />85 40 <br />Y <br />P, <br />:F1" Existing sewer force main <br />o to be abandoned in place - <br />Y east of connection <br />0 <br />0 <br />-'W <br />Add Alt #2 <br />A� <br />Proposed West Ten Pump Station = Parcels <br />Proposed Force Main <br />.N 1 = 600 feet <br />o zoo <br />Feet <br />Orange County Planning and Inspections <br />Brian Carson (1/5/2015) <br />Proposed West Ten Rd. force <br />main connects to gravity sewer <br />Rock Rd <br />at Quarry <br />o1 <br />Existing Force Main Proposed Gravity Sewer <br />8" � 8" <br />10" .■IIIIIIIIIIIII■ 12" <br />FORREST <br />Add Alt #1 <br />85 40 <br />Y <br />P, <br />:F1" Existing sewer force main <br />o to be abandoned in place - <br />Y east of connection <br />0 <br />0 <br />-'W <br />Add Alt #2 <br />A� <br />Proposed West Ten Pump Station = Parcels <br />Proposed Force Main <br />.N 1 = 600 feet <br />o zoo <br />Feet <br />Orange County Planning and Inspections <br />Brian Carson (1/5/2015) <br />
The URL can be used to link to this page
Your browser does not support the video tag.