Orange County NC Website
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />21 <br />To amend agreement to permit additional time (i.e. 2 years) for water and /or sewer system <br />construction initiation in the Eno Economic Development District (EDD) <br />Background <br />In late 2011 and January 2012 Orange County and the City of Durham- <br />• Interlocal Agreement <br />• "Interlocal Agreement between Orange County and the City of Durham <br />for Construction and Operation of Water and Sewer Facilities in the <br />Eno Economic Development Zone of Orange County" <br />• Formal utility service area; Orange County's Eno Economic Development District <br />area <br />• Similar land use since the early 1980's <br />Agreement <br />• Water and sewer service; <br />• Feasibility, <br />• Design, construction and <br />• Operation <br />• Development fees <br />Orange County Role <br />• Future CIP projects were programmed for investment in the area. <br />• Article 46 economic development infrastructure investment in the area. <br />Past Engineering Utility Findings <br />• Engineering feasibility analysis conducted by CDM Smith <br />• Examined a large EDD 796 acre district -wide solution <br />• High off -site (i.e. Durham area) infrastructure costs limited the funding of a master system <br />but outlined the likely service layout <br />• Full report <br />— http: / /orangecountync.gov /planning/ documents /ENOReportNovember20l3.pdf <br />Focus Area <br />• Examine 100 ± acre area is in the far northeast corner of the Eno EDD between 1 -85 and <br />US 70 adjacent to the City of Durham <br />• A scaled -back utility program is suggested <br />(see Focus Area in Attachment 4 on page 186) <br />Request Tonight <br />• Amend the agreement for a new design and construction timeline <br />• 2 additional years <br />Recommendation: <br />The Manager recommends that the Board <br />• Approve the amendment <br />• Transmit to the City of Durham <br />Craig Benedict said the original estimate to serve the entire area was approximately $5.8 <br />million, which exceeds the County's financial wherewithal. He said this larger price tag was due <br />to the fact that a lift station would have to flow roughly 3 miles into Durham. He said for this <br />reason, the scaled back program and focus area are suggested. <br />