Browse
Search
NSN Aging/OPT - Transportation Development Plan Update for Orange County, NC for 1995-1999
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
1990 - 1999
>
1995
>
NSN Aging/OPT - Transportation Development Plan Update for Orange County, NC for 1995-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 9:32:00 AM
Creation date
1/14/2015 9:31:18 AM
Metadata
Fields
Template:
BOCC
Date
12/19/1995
Meeting Type
Regular Meeting
Document Type
Others
Agenda Item
VIII-I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year One — Fiscal Year 1995-1996 <br /> Within the first year, new vehicles already approved should be arriving for use by OPT. The <br /> vehicles should be used to replace the vehicles with the highest mileage. During the first year, an <br /> application for two more replacement vans should be filed. Both the 14-passenger van and the 20 <br /> passenger cutaway van will be equipped with a wheelchair lift. These two vehicles should be used to <br /> replace vehicle numbers 14 and 21. As shown in Table 4-1, the total first year capital cost is $76,000, <br /> with a local share of$7,600, a state share of$15,200, and a federal share of$52,200. <br /> Year Two — Fiscal Year 1996-1997 <br /> In the second year of the plan, only one vehicle needs to be replaced, vehicle number 2. The <br /> replacement vehicle will be a 24-passenger van cutaway (small bus) equipped with a wheelchair lift. It <br /> will be utilized to run nutrition and workshop trips for senior in Northern Orange County and Chapel Hill. <br /> Year Three— Fiscal Year 1997-1998 <br /> In the third year of the plan, four vehicles will need to be replaced by OPT. These vehicles will <br /> consist of two 6-passenger mini-vans and two 14-passenger van equipped with wheelchair lifts. The <br /> replacement vehicles will take the place of vehicles numbered M6, A8, 11, and 12 respectively. <br /> At current funding levels and current pricing, the total cost would be $104,600, with a local share(10%) <br /> of$10,460, a state share (20%) of$20,920, and a federal share (70%) of$73,220. <br /> Year Four — Fiscal 1998-1999 <br /> In year four, two vans will need replacement. They should be replaced by two 14-passenger <br /> center aisle vans which will not need to be wheelchair equipped. <br /> Summary of Vehicle Replacement Plans <br /> The objective of the vehicle replacement plan is to maintain and improve the vehicle fleet by <br /> replacing all of the high mileage vehicles. The selected alternatives in the 1995 Transportation <br /> Development Plan does not necessitate any fleet expansion. <br /> -48- <br />
The URL can be used to link to this page
Your browser does not support the video tag.