Browse
Search
Agenda - 12-19-1995 - IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 12-19-95
>
Agenda - 12-19-1995 - IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2015 4:23:29 PM
Creation date
1/13/2015 4:23:20 PM
Metadata
Fields
Template:
BOCC
Date
12/19/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19951219
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
RES-1995-062 Resolution Concluding Orange County's Role and Interest in the Development, Ownership and Operation of the Piney Mountain Subdivision Waste Treatment System
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> individual STEP systems are also not shown within the project cost/expenditure figures. These expenses <br /> were not eligible for payment from the County project fund, even though these expenditures were <br /> included in the estimates which determined the total amount of the fund. This situation arose when the <br /> procedures by which those expenses were incurred failed to conform to statutory bidding requirements <br /> for publicly funded projects. <br /> The contracts governing the actions and responsibilities of OWASA, the Homeowners Association and <br /> the County relative to the wastewater treatment system improvements make provision for repairs <br /> to the STEP systems owned by the individual homeowners in the Piney Mountain subdivision. The <br /> agreements require that an engineer provide a certified evaluation of needed STEP system repairs with a <br /> cost estimate for accomplishing those repairs. The STEP system evaluations were provided as required <br /> and STEP system repairs have been completed to the satisfaction of OWASA and have been certified as <br /> complete and satisfactory by the STEP system engineer. <br /> If I may provide additional information or clarification, please advise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.