Orange County NC Website
Orange Water and Sewer Authority 4 <br /> Jones Ferry Road <br /> OWASA <br /> P.O. Box 366 <br /> Carrboro, NC 27510 <br /> (9191968-4421 <br /> Mr. Paul Thames, P.E. November 2, 1995 <br /> County Engineer <br /> Orange County <br /> P.O. Box 8181 <br /> Hillsborough, N.C. 27278 <br /> Dear Paul: <br /> ct : Pin Collector Svstern <br /> J & <br /> .'Jub:cc -ev Mountain Pump Station, Force Nfain. and <br /> A review of our records for the above project indicate construction to be completed in <br /> accordance with the Contract Documents, The Certificate of Substantial Completion has been <br /> issued by Colonial Engineering setting this date on June 16, 1995. In accordance with Section <br /> 29.1 of the General Conditions of the Contract Documents, the Contractor shall warrant and <br /> guarantee the system for a period of one (1) year from the date of Substantial Completion. One <br /> month prior to the expiration of the Warranty period, an inspection of the system will be <br /> performed to ensure that the system is free from any deficiencies. Any problems encountered <br /> will have to be corrected within 3)0 days. In addition, the pumps installed at the pump station <br /> shall have a warranty period extended from one (1) year to (3) years and shall be inclusive of all <br /> of the standard terms and conditions of the original warranty. <br /> A review of close-out documents indicates that as-built drawings for the collectors system have <br /> been submitted by RUST Environmental for review and approval. These are generally <br /> acceptable. RUST Environmental will transfer as-built information to reproducible mylar sheets <br /> and resubmit to OWASA for permanent record. On October 24, 1995 as-built drawings for the <br /> pump station and force main were received from Colonial Engineers. These are generally <br /> acceptable. Final invoices are forthcoming from both RUST Environmental and Colonial <br /> Engineering for the prepara:tiuri and cufnpletion of these drawings. in order to expedite the <br /> close-out process I have asked both Colonial and RUST to submit their final invoices for this <br /> work as soon as possible in order that final payments can be made. They have indicated they will <br /> remit fina' l invoices promptly. <br /> These would be the only outstanding invoices remaining which are their final requests for <br /> payment for Engineering Services. As I have stated previously, payment of all outstanding bills <br /> related to this project must be made to all appropriate parties prior to project close-out and <br /> OWASA acceptance. In fact, it is to be understood that all outstanding invoices from parties <br /> responsible for performing work in accordance with the Legal/Engineering Services <br /> Agreements and those performing any additional construction work in connection with the <br /> project are to be paid prior to release of moneys back to the Homeowners Association. After the <br /> moneys are returned to the Homeowners Association, and the Authority has accepted the system, <br /> An Equal Opportunity Empioyer <br />