Orange County NC Website
ORANGE COUNTY PLANNING DEPARTMENT <br /> 306F REVERE ROAD <br /> HILLSBOROUGH, NORTH CAROLINA 27278 <br /> o , <br /> J <br /> November 29, 1995 <br /> Moses Carey, Jr. <br /> Chairman, Orange County Board of Commissioners <br /> PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Dear Moses: <br /> Regarding your letter <br /> Committee for 1996-97 °n Priorities of the Water <br /> headway has been made toward accomplishing to report that significant <br /> past fiscal year. The GIS database for water resource gning the <br /> Project goals during the <br /> necessary equipment u s now has all <br /> that will comprise the data baseiis now in the system <br /> one-third is available for Purchase and about one-third of the data <br /> Positioning S e with exist ng fundsh1Two Global <br /> accurately System (GPS) transceivers have been <br /> earl y locate all new wells and septic tanks Purchased to <br /> y in 1996, Environmental Health personnel will tanks, <br /> using this <br /> equipment in the field (although g using this <br /> exist) . The pilot Ground Water Recharge ate GPS equipment needs <br /> approximately halfway to completion g Project with USGS is <br /> Compatible data to be available in October 19911 report and GIS- <br /> On the public education front, substantial work has be <br /> developing a second brochure on abandoned wells en done in <br /> or slide presentation on ground , and toward a video <br /> ound water <br /> addition, several other ideas that link both Orange County. In <br /> Public education are underwa <br /> y in articular , a a* The Committee is excited about one <br /> P proposed Water Center" <br /> cooperation with staffs from the Soil and Water District Planning, <br /> that is being planned in <br /> Engineering, Environmental Health <br /> Service. We feel that the Water Center will Cooperative Extension <br /> service to citizens on water-related <br /> existing Provide s convenient <br /> g staff resources. questions and issues, using <br /> In terms of top priorities for <br /> Committee would list the following: year,1996-97 fiscal <br /> year, the <br /> 0 The continuation of ongoing projects,second year of the USGS Ground Water Recharg g the <br /> e <br /> project and others as listed above. <br /> g Rate <br />