Orange County NC Website
1 , <br /> CHAPTER 7 - SUMMARY AND RECOMMENDATIONS <br /> If the optional plan is to complete all construction by the <br /> year 2000 such that the facility is large enough to meet the <br /> space requirements up to the year 2020, the total estimated <br /> project cost would be $51,961,230. This option would <br /> require only one construction period and a single financing <br /> effort as compared to a multiphased construction plan <br /> requiring multiple financing efforts. <br /> RECOMMENDATIONS The following recommendations were made by the Justice <br /> Facilities Study Committee in order of priority; <br /> ♦ Work together with the Orange County Commissioners <br /> to either adopt or modify the recommended action plan <br /> of this Committee. <br /> ♦ Finalize Schedule for Action Plan. <br /> ♦ Coordinate with the Orange County Capital <br /> Improvements Program for establishing a funding <br /> timeline. <br /> ♦ Create a Steering Committee <br /> Identify Members and Their Roles <br /> Prepare for Consensus Building <br /> Create a"Game Plan" <br /> ♦ Contract for Needs Assessment <br /> Inmate projections <br /> Evaluate existing building systems <br /> ♦ Contract for Definitive Program Document <br /> ♦ Contract for Site Selection <br /> Create a Site Selection Committee <br /> ♦ Contract for Schematic Design <br /> Based on specific site, needs assessment and <br /> program documents <br /> ♦ Implement"Selling the Concept" <br /> Public Information Meeting <br /> Multi-Media and Event Exposure <br /> ♦ Obtain financing through bonds or other financing <br /> mechanisms identified in this report. <br /> 7-3 <br />