Browse
Search
Agenda - 12-04-1995 - X-E
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 12-04-95 - Work Session - Late
>
Agenda - 12-04-1995 - X-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2015 11:43:20 AM
Creation date
1/13/2015 11:43:16 AM
Metadata
Fields
Template:
BOCC
Date
12/4/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-E
Document Relationships
Minutes - 19951204
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> 3 <br /> 1 <br /> CHAPTER 7 - SUMMARY AND RECOMMENDATIONS <br /> related services for "one stop shopping" at a central <br /> governmental complex. There is also the added challenge of <br /> creating an architectural design that projects a "citizen <br /> friendly" image while developing an aesthetic that is <br /> sympathetic and responsive to the Historical Character of <br /> Hillsborough. Incorporating the existing courts and <br /> detention facilities into this future complex will realize <br /> significant savings for the overall cost of construction. <br /> The Secondary Facility will be a single story facility <br /> located in Chapel Hill possibly on land owned by the <br /> County on Homestead Road or along the I-40 corridor <br /> between Chapel Hill and Hillsborough (see Figure 1). This <br /> facility is envisioned to be a satellite facility providing <br /> limited duplicative services to the population center in the <br /> southern end of Orange County. The selected site will need <br /> to meet criteria that addresses ease of access to public <br /> transportation, availability to utilities, buildability and size <br /> with respect to being able to accommodate future expansion. <br /> Time Schedule for In order to address the identified 1995 deficiencies of space <br /> Occupancy (approximately 28,000 gross square feet) and construct <br /> facilities sufficient to meet the space needs through the year <br /> 2020, it is the Justice Facilities Study Committee's <br /> recommended goal to occupy both site locations by the year <br /> 2000. This means that initial steps towards achieving that <br /> goal need to be started immediately and following the <br /> outline in Figure 31. <br /> Scope of Project The projected gross square footage required for the years <br /> 2005 and 2020 are; 213,530 and 312,840 square feet <br /> respectively. The estimated total project costs for the years <br /> 2005 and 2020 are $24,228,100 and $34,723,400 <br /> respectively. These estimates include escalation for <br /> inflation and assume a phased construction building plan to <br /> be completed in the years 2005 and 2020. The total project <br /> costs spent for construction by the year 2020 would be <br /> $58,951,500.. <br /> 7-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.