Orange County NC Website
J <br /> 5 <br /> AR,TICg 4 <br /> CONTRACT SUM <br /> 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the <br /> Contract Suva of am Hundred Swim Thousand_ 0M Hundred and OOAOO Dollars <br /> {8107,100.00),subject to additions and deductions as provided in the Conbscs Documents. <br /> 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract <br /> Documents and art hereby accepted by the Owner. <br /> (Soon,eke members or otArr ldsatpleodan if accapW shernates. If Accufon on athw aahenwst are to be erode by tim ovn"tsr <br /> subsquent to the e:eeamw of Nks Avviraeot, anach a scked ds of zwh other elarrnates s6etet W ON amawd jor sack and dw <br /> dam oxHif"eh riot saratuw u vetltd) <br /> Hale Bid $85.000.00 <br /> Alternate 9-1 include in Sase Bid <br /> Alternate ernatse 9-2 $22,100.00 <br /> 4.3 Unit prices,if nay,us as 10ows: <br /> Glass Lites deduct (12.00) <br /> ARMCaLE I <br /> PROGRESS PAYMENTS <br /> 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for <br /> Payment issued by the Architect.the Owner shall malt progress payments on account of the Contrau Sum to the <br /> Connactor as provided below and elsswhere in the Contrsrt Docase nts. <br /> 6.2 The period covered by each Application In Payment shall be one calendar month ending on the last day of <br /> the month, or as follows: <br /> 5.3 Provided an Application for Payment is received by ttee Architect not later dm the lames day of a month,the <br /> Owner shall make payment to the Contraictor not later tZsw th».To (10tiy of the aext month. if as <br /> Application for Payment is received by the Architect after the application date fixed above, payment shall be <br /> mule by the Owner not later than Ten .days after dw Architect receives tbs Application for Paymeai <br /> 3.4 Each Application for Payeeema shell be based upon the Schedule of Vahtes submitted by the Contractor in <br /> accordance with the Contract Docianis s. The Schedule of Values aball allocate ft entire Contract Sum among <br /> the various portion of do Work add be prepared in such form and supported by such data to substantiate its <br /> accuracy as the Architect clay require. This schedule. unless objected to by the Architect, shall be used as a <br /> basis for reviewing the Cmuntaft Applications for Payttteat. <br /> 6.5 Applications far Payment shall inducts the percentage of completion of each portion of the Work as of the <br /> end of the period covered by the Application for Payment. <br /> 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be <br /> computed as follows: <br /> G.B.I. Take that portion of the Contract Sum properly allocable to completed Work as determined by <br /> multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum <br /> allocated to that portion of the Work in the Schedule of halos:,less retainage of Ten percent(IQ%).Pending <br /> final determination of cost to the Owner of changes in the Work, amounts not in dispute may be included as <br /> AIA -AM.tA►MOM IN?.Tea AleatVA0=ffrJN OF AxaffrMTS,ins Vtw <br /> TQAY AVVXJt.NN,WASODIGTOM.O.C.>seea•.aeL MAAMMM v.ew.ra p.amsoIe"•:•Isar It.f...ydwo,two ad Y @W*N r 4M Mr 1 Tfi.4mson"va. <br /> r/r Wwr Was" 1 Maerat ui rr M NMadavA widow.idAHw.sail I N711k <br /> Electronic Document Service A101-1967 3 <br />