Orange County NC Website
other tower users in the area,scaring their siting needs and/or Where the site abuts or has access co a collector and local street, <br /> sharing capabilities in an effort to encourage tower sharing. access for maintenance vehicles shall be exclusively by means of <br /> Applicants cannot be denied or deny space on a tower unless the collector street. <br /> mechanical,structural,or regulatory factors prevent them from Parking requirements generally do not apply to cellular <br /> sharing. In other words,competing carriers cannot lock each towers. For chose communities that require parking, the <br /> ocher our of territory.The ordinances for Jefferson County, L_ provision applies to an overall"communication cower facility" <br /> Oldham Counry_Mulcnomah County,and Palm Beach_County ordinance in which spaces are required only when the <br /> o.fFer-detailed examples of sharing provisions and leasing terms. equipment building is staffed. <br /> Structural Integrity and Inspection.Most ordinances require Lighting and Security. Lighting for communication cowers is <br /> chat any new or modified towers be certified by an engineer accord- required when the cower is tall enough to concern the Federal <br /> ing to structural standards for antennas offered by either the Elec- Aviation Administration (FAA).Jefferson Parish acknowledges <br /> Ironic Industries Association or the Telecommunication Industry FAA regulations and the privacy of neighboring property owners: <br /> Association.Inspection schedules seem to vary widely according to When lighting is required and is permicred by the Federal <br /> the type of tower,as in this provision from Jupiter,Florida: Aviation Administration or other federal or state authority,is <br /> Inspections—The town council may require periodic inspections shall be oriented inward so as not co project onto surrounding <br /> of communication towers to ensure structural integrity.Such residential property. <br /> inspections may be required as follows:a)monopole towers—at Others, in more urban areas,may require full review and <br /> least once every 10 years;b)self-support cowers—ac least once certification of the tower application by their local airport <br /> every five yeah;c)guyed cowers—ac least once every three years. authority.This provision is from Palm Beach County: <br /> Inspections shall be conducted by an engineer licensed by the <br /> stare of Florida.The results of such inspections shall be provided Prior to the site plan certification,the applicant shall provide <br /> to the director of community development.Baud upon results of documentation that the proposed communication tower has been <br /> an inspection,the town council may require repair or removal of reviewed and is nor determined to be a hazard by the FAA... <br /> a communication cower. (via)the Palm Beach County Department of Airports....The <br /> PBCDOA shall review the communication tower application to <br /> Equipment Buildings and Lot Sizes.Cellular towers are often determine if it is a hazard to any FAA flight paths. <br /> accompanied by a small,usually unstaffed storage building that <br /> houses transmitting equipment.Some ordinances treat them as Some ordinances also require fencing or signage.Jupiter <br /> accessory uses or structures,while others specifically scare that requires a six-foot safety fence with a locked gate. If high voltage <br /> they are not.Most require some setback from adjoining is necessary,signs must be posted every 20 feet,saying, <br /> property lines; the required setback is usually proportional to "Danger—High Voltage."The operator must also post"No <br /> the area's density.Oldham County seeks to discourage more Trespassing"signs. <br /> intense use of the site: Abandonment.Most ordinances also restrict the rime in <br /> [Tlhese facilities may not include offices,long-term vehicle which an unused rower may stand to between six and 18 <br /> storage,other outdoor storage,or broadcast studios,except for months,with some requiring the tower applicant to cover the <br /> emergency purposes,or other uses char are not needed to send demolition costs. <br /> or receive transmissions. Application Requirements.Perhaps the most telling section <br /> of any ordinance is its application requirements.Although some <br /> Loc sizes for cellular sites are usually the minimum for the communities do not list these separately,doing so lets the <br /> district in which they will be built. applicant know exactly what must be provided and indicates <br /> Maintenance and Parking.A few ordinances include how much the community knows about the impacts of cellular <br /> standards for facility maintenance and parking.The phone tower siting.These requirements should be clearly stated <br /> Multnomah County ordinance has the most extensive treatment and not impossible to fulfill.Jefferson County offers an <br /> of maintenance impacts: __ _ excellent explanation of what is requires m any tower <br /> Equipment at a transmission facility shall be automated co the - applicant,and its provisions demonstrate serious research by the <br /> greatest extent possible to reduce craffrc and congestion.The planning department and other local agencies.Review of!his <br /> applicant shall describe anticipated maintenance needs, ordinance and its acccoomp nit"Low Power Mobile Radio <br /> including frequency of service,personnel needs,equipment ommunications Land Use Plan Addendum°is recommended <br /> needs,and traffic,noise,or safe impacts of such maintenance. - <br /> cY� P !•o�anyone dealing with cellular siting is-sties. <br /> Meeting the Challenge <br /> Zoning News is a monthly newsletter published by the American Planning Association. Any cellular carrier seeking to locate in a community is prepared <br /> Subscriptions are available for$45(U.S.)and S54(foreign). to deal with siting controversies.Some corporations have even <br /> Michael B.Barker,Executive Director;Frank S.So,Deputy Executive Director, one so far as to ay for retainin a Trd- a consultant co <br /> William R.Klein,Director of Research. $ f P g hi nY <br /> P <br /> Zoning News is produced at APA.Jim Schwab,Editor.Michael Barrette.Dan Biver.Fay review anything they have helped draft.These firms target sires <br /> Dolnick.Michelle Gregory.Sanjay Jeer,Beth McGuire,Marys Morris.Chris Smith, for acquisition based on their topographic efficiency, choir <br /> Reporters;Cynthia Cheski.Assistant Editor,Lisa Barton.Design and Production. accessibility by road, the availability of elearie power and land- <br /> Copyright©1995 by American Planning Association, 1313 E.60th St.,Chicago.IL based telephone lines, their leasabiliry,preexisting vegetation and <br /> 60637.The American Planning Association has headquarters offices at 17-6 <br /> Massachusetts Ave.,N.W.,Washington,DC 20036. screening potential, existing zoning,compatibility with adjacent <br /> All rights reserved.No part of this publication may be reproduced or utilized in any land uses,and their ability to transmit to the largest area. <br /> form or by any means.electronic or mechanical,including photocopying,recording. If local governments show char they can meet most of these <br /> or by any information storage and retrieval system,without permission in writing <br /> from the American planning Association. needs while preserving their community's aesthetic integrity, <br /> Printed on recycled paper.including 50-70%recycled fiber health, and safety, they should be able to avert federal <br /> and 10%postconsumer waste. ® preemption of their local rights and responsibilities. <br /> 4 <br />