Browse
Search
Agenda - 11-27-1995 - C-2-b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 11-27-95
>
Agenda - 11-27-1995 - C-2-b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2015 4:08:30 PM
Creation date
1/12/2015 4:08:18 PM
Metadata
Fields
Template:
BOCC
Date
11/27/1995
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-2-b
Document Relationships
Minutes - 19951127
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> 114 <br /> � D <br /> BOOK 794 PACE 414 <br /> ATTACHMENT A. <br /> Description of Henry Ernest Jones <br /> Warranty Deed <br /> BEGINNING at an iron stake (control) in the West Right of <br /> Way line of N.C. Highway §6 in the Southeast corner of John L. <br /> Poteat; running thence with said Highway South 7 degrees 45' East <br /> 125 feet to an iron in the West right of way line of said <br /> Highway; thence a new line with Torain South 89 degrees 02' West <br /> 394.66 feet to an iron set in the East line of Terry Fuqua; <br /> thence with said Terry Fuqua North 2 degrees 52' East 1I5 feet to <br /> a an existing iron (control) in the Southwest corner of John L. <br /> Poteat; thence with said Poteat North 87 degrees 36' East 373 <br /> feet to the point and place of beginning, containing 1.05 acres <br /> according to plat and survey of Robert A. Jones, dated January 6, <br /> a 1969 and entitled "Property of Henry Ernest Jones". <br /> > BEGINNING at an iron which is located South 89 degrees 40 <br /> minutes West 264 feet from an iron in the West right of way line <br /> of N.C. Highway 86 in the North line of Leroy Torain, running <br /> a thence from said beginning point South 4 degrees 30 minutes West <br /> 170 feet to an iron, a new corner; thence South 89 degrees 40 <br /> minutes West 128 feet to an iron in the line of Donald Wright; <br /> thence with Wright North 4 degrees 30 minutes East 170 feet to an <br /> ti iron, the Southwest corner of the party of the second part; <br /> thence North 89 degrees 40 minutes East 128 feet to the place and <br /> point of beginning, containing 0.50 acres, according to plat of <br /> survey of PROPERTY OF HENRY JONES, surveyed November 10, 1973, by <br /> Robert A. Jones, Registered Surveyor. <br /> Y <br /> u <br /> * It is the intention of Tracts 1 and 2 to remain one parcel for <br /> °x the Grantee. Py.�vi <br /> z <br /> m <br /> i <br /> c <br /> S <br /> O <br /> U <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.