Browse
Search
RES-1995-055 Resolution (with attachments) Authorizing the Town of Chapel Hill to Utilize the Landfill Reserve Fund to Purchase the Property Known as the Neville Tract
OrangeCountyNC
>
Board of County Commissioners
>
Resolutions
>
1990-1999
>
1995
>
RES-1995-055 Resolution (with attachments) Authorizing the Town of Chapel Hill to Utilize the Landfill Reserve Fund to Purchase the Property Known as the Neville Tract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2015 9:11:10 AM
Creation date
1/9/2015 1:44:54 PM
Metadata
Fields
Template:
BOCC
Date
11/1/1995
Meeting Type
Work Session
Document Type
Resolution
Agenda Item
V-A
Document Relationships
Agenda - 11-01-1995 - V-A
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\1990's\1995\Agenda - 11-01-95
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� T <br />Attachment <br />LANDFILL SOIL QUANTITY ANALYSIS <br />r� <br />Soil. Needed <br />North Side Final Cover for C &D (old sanitary area) <br />2 6 ,13 6c Y <br />(needed in 1996 } <br />- North Side Final Cover for Ash <br />/C &D <br />72 640c Y <br />(needed 2000) <br />-- South Side Soil Liner (Phase <br />3) <br />31 944c <br />' Y <br />(needed 1597 98 ) * <br />-- South Side Soil Liner (Phase <br />4) <br />33 396c Y <br />(needed 2000/01)* <br />South Side Final _Cover <br />145 , 684c Y <br />(needed 2005 * <br />-- South Side Daily Cover <br />400,000c y <br />(based on existing daily <br />amount required) <br />Total <br />709,760cy <br />* Assumes alternate daily cover <br />usage in est . phasing <br />schedule. <br />Soil Available <br />-� Soil in Stockpile <br />- <br />200 000c y <br />-- Soil Remaining in Phase 3 and <br />4 <br />100 00❑c y <br />- Alternate Daily Cover Impact <br />219 80Oc <br />► Y <br />~- Soil Needed from off -Site <br />190 0❑0c <br />Total <br />709,800cy <br />
The URL can be used to link to this page
Your browser does not support the video tag.