Orange County NC Website
54 <br /> • The National Wetlands Inventory Maps for Orange County, N.C. prepared by the U.S. <br /> Fish and Wildlife Service; <br /> • The Orange County, N.C. Soil Survey prepared by the U.S.D.A. Soil Conservation <br /> Service; <br /> • A required Environmental Assessment or Environmental Impact Statement; and/or <br /> • A site analysis conducted by a registered engineer, land surveyor, landscape architect, <br /> architect or land planner using data from the U.S. Army Corps of Engineers. <br /> h. Active and passive recreation areas, including, but not limited to: <br /> • Public recreation areas, including district and community parks, as identified in the <br /> Master Recreation and Parks Plan; and <br /> • Private recreation facilities, such as pedestrian, bicycle, and equestrian trails, picnic <br /> areas, community commons or greens, golf courses, playing fields, playgrounds, and <br /> courts. <br /> #' #'�i14ftEr <br /> Joyner Comment: The shaded provision is not appropriate for proposed transportation <br /> corridors and growth(Transition)areas. Need to provide Aglin recreation areas because of <br /> density. Even in rural areas, need active recreation areas, particularly where lot sizes are <br /> reduced to provide open space. Otherwise, parents will end up drivi children to parks. <br /> i. Public and private infrastructure improvements, including, but not limited to: <br /> • Community water supply and sewage disposal systems, provided that: <br /> 0 No more than fifty percent (50%) of the land area occupied by such systems <br /> may count toward the minimum thirty-three percent (33%) open space <br /> requirement; and <br /> 0 Such systems are not located on portions of the site occupied by floodplains and <br /> alluvial soils; steep slopes; wetlands; natural areas, and wildlife habitats and <br /> corridors; and historic and archaeological sites. <br /> Off-site nitrification fields for individual lots are permitted in open space areas subject <br /> to the same limitations. <br /> 0 Stormwater management facilities for the proposed development,including those required <br /> for watershed protection purposes, provided such systems are not located on portions of <br /> the site occupied by floodplains and alluvial soils; steep slopes; wetlands; natural areas, <br /> and wildlife habitats and corridors; and historic and archaeological sites. <br /> 0 Existing above-ground utility rights-of-way,such as overhead power transmission lines, <br /> and existing street rights-of-way, except that their land areas shall not count toward the <br /> minimum thirty-three percent (33%)open space requirement. New street rights-of-way <br /> may be counted but only to the extent that: <br /> 0 They are required to pass through or by open space uses as defined herein to <br /> link one buildable portion of a site with another; and <br /> Flexible Development 4 <br />