Orange County NC Website
ORANGECOUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 17, 1995 <br /> Action Agenda <br /> Item# V.=- <br /> SUBJECT:NCDOT Encroachment Agreement for installation of sewer taps <br /> and service laterals on Efland sewer system <br /> DEPARTMENT: County Manager PUBLIC HEARING: —Yes x No <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> County Engineer ext. 2303 <br /> NCDOT standard form Blanket <br /> Encroachment Agreement for TELEPHONE NUMBERS: <br /> Utility Service Connections Hillsborough - 732-8181 <br /> on Primary and Secondary Durham - 688-7331 <br /> Roads Mebane - 227-2031 <br /> Chapel Hill - 967-9251/968-4501 <br /> PURPOSE: To request that the BOCC authorize the County Manager to sign and execute a"Blanket <br /> Encroachment Agreement" with NCDOT which will substantially reduce the service delivery time <br /> frame necessitated by the current encroachment process in which the County must request that <br /> NCDOT grant an individual encroachment for construction of each new sewer tap/service lateral in <br /> the Efland sewer system. <br /> BACKGROUND: Under current regulatory practices, Orange County must request NCDOT's permission each <br /> and every time it wishes to install a sewer tap on-and service lateral from-a sewer main <br /> which lies within a NCDOT right-of-way. The degree of difficulty in- and time frame for- <br /> securing permission to encroach vary indirect proportion to the complexity of the sewer tap/ <br /> service lateral construction project. For example, constructing a sewer service consisting of a <br /> tap on a minimal depth main lying in a roadway shoulder but well away from the pavement <br /> edge and a service lateral extension to a property adjoining the sewer main side of the road <br /> would be a simple project. As it would involve no real impact on the roadway or the <br /> passage of traffic,permission to encroach could probably be secured in approximately two <br /> weeks. Constructing a sewer tap on and service lateral from a main lying under the paved <br /> section of roadway would be a much more difficult project. It would involve at minimum: <br /> a)pavement and roadway substructure excavation for installation of both the tap and service <br /> lateral; b) traffic control and safety; and c) structural backfill and pavement repair. In this <br /> situation, securing NCDOT permission to encroach could be a four week process. <br />