Browse
Search
Agenda - 10-17-1995 - VIII-E
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 10-17-95
>
Agenda - 10-17-1995 - VIII-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 10:47:24 AM
Creation date
1/8/2015 10:47:22 AM
Metadata
Fields
Template:
BOCC
Date
10/17/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-E
Document Relationships
1995 NS Blanket Encroachment Agreement Underground Utility Service Connections on Primary and Secondary Road System - Agenda 10-17-1995 - VIII-E
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1995
Minutes - 19951017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGECOUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 17, 1995 <br /> Action Agenda <br /> Item# V.=- <br /> SUBJECT:NCDOT Encroachment Agreement for installation of sewer taps <br /> and service laterals on Efland sewer system <br /> DEPARTMENT: County Manager PUBLIC HEARING: —Yes x No <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> County Engineer ext. 2303 <br /> NCDOT standard form Blanket <br /> Encroachment Agreement for TELEPHONE NUMBERS: <br /> Utility Service Connections Hillsborough - 732-8181 <br /> on Primary and Secondary Durham - 688-7331 <br /> Roads Mebane - 227-2031 <br /> Chapel Hill - 967-9251/968-4501 <br /> PURPOSE: To request that the BOCC authorize the County Manager to sign and execute a"Blanket <br /> Encroachment Agreement" with NCDOT which will substantially reduce the service delivery time <br /> frame necessitated by the current encroachment process in which the County must request that <br /> NCDOT grant an individual encroachment for construction of each new sewer tap/service lateral in <br /> the Efland sewer system. <br /> BACKGROUND: Under current regulatory practices, Orange County must request NCDOT's permission each <br /> and every time it wishes to install a sewer tap on-and service lateral from-a sewer main <br /> which lies within a NCDOT right-of-way. The degree of difficulty in- and time frame for- <br /> securing permission to encroach vary indirect proportion to the complexity of the sewer tap/ <br /> service lateral construction project. For example, constructing a sewer service consisting of a <br /> tap on a minimal depth main lying in a roadway shoulder but well away from the pavement <br /> edge and a service lateral extension to a property adjoining the sewer main side of the road <br /> would be a simple project. As it would involve no real impact on the roadway or the <br /> passage of traffic,permission to encroach could probably be secured in approximately two <br /> weeks. Constructing a sewer tap on and service lateral from a main lying under the paved <br /> section of roadway would be a much more difficult project. It would involve at minimum: <br /> a)pavement and roadway substructure excavation for installation of both the tap and service <br /> lateral; b) traffic control and safety; and c) structural backfill and pavement repair. In this <br /> situation, securing NCDOT permission to encroach could be a four week process. <br />
The URL can be used to link to this page
Your browser does not support the video tag.