Browse
Search
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 10-11-95
>
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 9:26:00 AM
Creation date
1/8/2015 9:04:12 AM
Metadata
Fields
Template:
BOCC
Date
10/11/1995
Meeting Type
Work Session
Document Type
Others
Agenda Item
1 and 2
Document Relationships
Minutes - 19951011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Establishment of screening criteria; <br /> Screening of the entire county to identify suitable areas; <br /> Ranking of the suitable areas for selection of candidate sites; and <br /> Selection of a finalist site using site data and preliminary engineering designs <br /> of the candidate sites. <br /> The initial list of 16 sites was eventually narrowed to four candidate sites: OC-2, OC-9, OC- <br /> 11, and OC-17. The next step in the process was to gather site specific data on the four <br /> candidate sites. This was done during the preliminary geotechnical investigation and the <br /> preliminary engineering evaluation completed on each of the four sites. <br /> Additionally, a request was made to the State of North Carolina Inter-Agency Task Force <br /> to visit the four candidate sites. The final report issued by the Inter-Agency Task Force <br /> noted "...That none of the four potential sites were excluded from further consideration, <br /> though, overall, site OC-17 received the most favorable comments." <br /> On February 24, 1995, our consultants issued the "Report of Preliminary Engineering <br /> Evaluations"which presented their evaluation of regulatory and technical issues. Although <br /> all sites were deemed to be technically suitable for a landfill,they recommended site OCA 7 <br /> as the preferred site. <br /> After several meetings of the Landfill Search Committee in the spring of 1995, the Landfill <br /> Search Committee voted to recommend site OC-1 7 and to remove the other three sites from <br /> consideration. The Chairman of the Landfill Search Committee presented their <br /> recommendation to the Landfill Owner's Group on June 15, 1995. <br /> The Landfill Owner's Group decided to hold a formal Public Hearing prior to making a <br /> decision on its recommendation. The Public Hearing was held on September 28, 1995. <br /> The Landfill Owner's Group will discuss and possibly make its final recommendation at its <br /> next scheduled meeting on October 19, 1995. This recommendation will be presented to <br /> the governing boards of Orange County, Carrboro and Chapel Hill for final approval. <br /> It should be noted that the Landfill Owner's Group also is evaluating alternatives to the <br /> current Landfill Owner's Group structure and considering various methods of financing the <br /> new landfill. it is likely that the new landfill would actually be acquired, financed and <br /> operated by the new organization. <br />
The URL can be used to link to this page
Your browser does not support the video tag.