Browse
Search
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 10-11-95
>
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 9:26:40 AM
Creation date
1/8/2015 8:56:27 AM
Metadata
Fields
Template:
BOCC
Date
10/11/1995
Meeting Type
Work Session
Document Type
Others
Agenda Item
1 and 2
Document Relationships
Minutes - 19951011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRANSPORTATION ADVISORY BOARD <br /> RECOMMENDATION <br /> June 1, 1995 <br /> CHAPEL HILL'S NORTHWEST AREA PLAN <br /> • Mr.Zaffron suggested that the Town of Carrboro forward to the Town of <br /> Chapel Hilt the text for the Connector Roads Concept Plan along with the <br /> map showing the proposed routes. Also indicate to Chapel Hill that it is the <br /> intent of Carrboro to utilize Eubanks Road as the primary northern area <br /> east-west connector. Therefore,for that reason,the Town of Carrboro would <br /> like to see Eubanks Road improved In their jurisdiction going all the way to <br /> NC 86(Airport Roads Also lncludc in it packet a copy of Carrboro's TIP <br /> requests and encourage Chapel Hill to amend the TIP request to reflect the <br /> same. Finally,forward to Chapel Hill Carrbero's proposal for Homestead <br /> Road as well,which includes preserving the rural character of the road <br /> instead of creating a major urban throughfare. <br /> The TAB also recommended that staff forward to the Torn of Chapel Hill <br /> and the University Land Use Planning Committee the Lake Hogan Farm <br /> buildout proposal and all connectors to the east(Tallyho Trail-dotted line, <br /> Camden,Claymore,and Hogan Easement). <br /> The TAB also suggests to Chapel Hill that an opportunity exists to extend <br /> Weaver Dairy Road southward to connect with Estes Drive as a north-south <br /> connector. Finally,the TAB also recommends that communication be open <br /> between the Towns of Carrboro and Chapel Hill,along with open <br /> communication amongst governmental and advisory bodies within each <br /> jurisdiction. <br /> The TAB agreed with the suggestions by consensus; therefore, no formal vote <br /> was taken. <br />
The URL can be used to link to this page
Your browser does not support the video tag.