Browse
Search
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 10-11-95
>
Agenda - 10-11-1995 - Items 1 and 2 - Appendix 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 9:27:03 AM
Creation date
1/8/2015 8:39:21 AM
Metadata
Fields
Template:
BOCC
Date
10/11/1995
Meeting Type
Work Session
Document Type
Others
Agenda Item
1 and 2
Document Relationships
Minutes - 19951011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary Analysis <br /> The Summary Analysis is an overlay map of the <br /> environmental inventory, including topography, <br /> soils, slopes, and existing conditions. <br /> The Summary Analysis identifies classifications of <br /> "buildable land" and identifies drainage patterns <br /> and watersheds. <br /> The land is classified into three categories: <br /> • Prime Buildable <br /> (Few or no building constraints.) <br /> • Secondary Building Constraints <br /> (Some building constraints due to poor soils, <br /> steep slopes, or other hydrologic conditions.) <br /> • Building Restricted - <br /> (Major building constraints due to extreme <br /> slopes, soil, hydrologic, or geologic <br /> conditions, and floodplains. Additional site <br /> analysis of soil conditions or <br /> hydrologic/geologic conditions are needed to <br /> determine acceptable building and site <br /> engineering techniques.) <br /> Area Summary <br /> The land with the most severe building constraints <br /> in this area is the land adjacent to the stream beds <br /> and those areas that have shallow depth to <br /> groundwater. <br /> Most of this area is prime buildable or secondary <br /> buildable land. <br /> A primary ridge runs from east to west. This ridge <br /> separates the New Hope drainage basin from the <br /> Booker/Bolin drainage basins. <br /> Page 22 Northwest Small Area Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.