Browse
Search
Agenda - 10-02-1995 - VIII-M
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 10-02-95
>
Agenda - 10-02-1995 - VIII-M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 2:40:02 PM
Creation date
1/7/2015 2:40:00 PM
Metadata
Fields
Template:
BOCC
Date
10/2/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-M
Document Relationships
Minutes - 19951002
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 4 <br /> 1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> Action Agenda <br /> Item No.v-� <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 2,1995 <br /> SUBJECT: CONTRACT APPROVAL; MECHANICAL ENGINEERING SERVICES <br /> DEPARTMENT: PURCHASING AND CENTRAL SERVICES PUBLIC HEARING:YES: NO:XX <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> PAM JONES, ext.2650 <br /> Proposal <br /> Telephone Number- <br /> Hillsborough 732-8181 <br /> Chapel Hill 967-9251 <br /> Mebane 227-2031 <br /> Durham 688-7331 <br /> PURPOSE: To consider authorizing the use of services of Gary Merritt, PE to prepare technical specifications <br /> and drawings with which to bid two projects. <br /> BACKGROUND: The design work to be performed by Gary Merritt will encompass the following scope of work: <br /> • Animal Shelter drain system: The drains in the older portion of the Animal Shelter continue to require <br /> significant maintenance due to frequent stoppage. As the Board may recall,the new section of the <br /> Shelter, constructed in 1988, utilized raised floors of the kennels with a flush drainage system. This <br /> number of service calls for this section of the Shelter is minimal. It is anticipated that the design will <br /> incorporate this concept into the modifications for the older section. Funds are available in the current <br /> Capital Improvements Program (CIP)to support this project(appro)(imately$55,000). <br /> • Replacement water lines at Northern Human Services Building,Cedar Grove: The water supply for <br /> this building has a high metal content,which is believed to be derived from the copper pipes supplying <br /> water to the building. The scope of work for this project includes removing the copper and replacing <br /> all water piping with PVC as well as installing water supply holding tanks in the building. The <br /> installation of the holding tanks will eliminate the need to utilize the existing water tower as a source <br /> for potable water. The water tower, however, will continue to be available for use by the fire <br /> department. Funds are available in the current CIP to support this project(approximately$20,000). <br /> Merritt has proposed a cost of$10,500 to design and prepare drawings and technical specifications for both <br /> projects. This represents approximately 12%of construction costs and is in line with standard engineering fees <br /> for projects of this size. <br /> RECOMMENDATION: The Manager recommends that the Board authorize the use of services of Gary Merritt, <br /> PE for the sum of$10,500;and authorize the Purchasing Director to execute the appropriate paperwork. <br />
The URL can be used to link to this page
Your browser does not support the video tag.