Orange County NC Website
Environmental Systems Research Institute,Inc. <br /> 380 New York Street <br /> Redlands,CA 92373 <br /> (909)793-2853 <br /> • Vendor Performance(Acceptance)tests <br /> • Assistance in familiarization with operation of hardware(ESRI and hardware vendor,as <br /> applicable) <br /> B.5 Responsibilities <br /> a. The County shall designate a person to act as system administrator who will learn the <br /> procedures for system installation,operation,maintenance coordination, and problem <br /> identification. <br /> b. The County shall, at its own expense, prepare the designated site in accordance with <br /> specifications and communications with a member of ESRI's staff. These preparations shall <br /> include installation of appropriate electrical wiring, air conditioning,heating,humidity <br /> control,lighting, and space for hardware components. <br /> c. ESRI shall coordinate the shipping,insurance, and delivery of the various hardware <br /> components,including communication with the County regarding appropriate logistics. <br /> d. The County shall provide appropriate insurance coverage for the equipment after delivery. <br /> e. ESRI shall provide an on-site specialist to interface the various hardware components, <br /> coordinate with the hardware vendor representatives in performing the various acceptance <br /> testing of each equipment component, and familiarize the users in use of the hardware. <br /> B.6 Acceptance of Equipment <br /> Unless otherwise agreed to in writing, acceptance of equipment shall occur when the hardware <br /> vendor,ESRI, and the County jointly verify that the equipment is installed and is operating in <br /> accordance with the manufacturer's published specifications. <br /> B.7 Manufacturer's Warranty and Infringement Indemnity <br /> The hardware warranty and infringement indemnity flow through from each respective <br /> manufacturer to the client user. <br /> A92-P1291-A1/RB B-2 7/7195 <br />