Orange County NC Website
L lr <br /> F <br /> (J) Conduct and produce a report on a • Will conduct once facilities have been open <br /> survey of solid waste directors on several months. <br /> program effectiveness. <br /> (K) Design and produce a report on a • Began design;will implement once facilities <br /> survey of users of facilities. open. <br /> (L) Provide staff support,meeting room, • Did this on a regular basis throughout the year. <br /> notices,minutes,progress reports,and <br /> technical assistance. <br /> • Not in scope of work. • Coordinated and provided significant technical <br /> assistance in the drafting of a regional contract <br /> with Laidlaw Environmental Services. <br /> • Not in scope of work. • Coordinated and provided significant technical <br /> assistance in the drafting and revision of permit <br /> applications. <br /> • Not in scope of work. • Set up first safety training for local government <br /> staff on hazardous waste management. <br /> • Not in scope of work. • Coordinated the detailed engineering work <br /> needed for each site. <br /> • Not in scope of work. • Conducted a cost/benefit analysis on several <br /> aerosol can recycling systems and obtained funding <br /> assistance for their purchase. <br /> • Not in scope of work. • Began coordinating purchase of equipment for <br /> facilities in order to achieve cost savings. <br /> • Not in scope of work. • Designed trash can hangers,flyers,and postcards. <br /> • Not in scope of work. • Maintained communication concerning permit- <br /> related issues with DEHNR's Solid Waste Section. <br /> 1 <br />