Orange County NC Website
Article 2: Procedures <br />Section 2.9: Conditional Districts <br />(f) A summary of utility services, including processing of <br />(a) A schedule of construction of all elements of the pry <br />(h) Any other information identified during th - application conference <br />de ed essential to demonstrate t roject's compliance with these <br />regulatio <br />(2) In lieu of the requirements a) above, an application for a Master Plan <br />Development (MPD) C shall i de the requirements in Section 6.7. The <br />requirements of ) through (1)(h) a e are applicable for MPD -CZ <br />applicatio <br />(3) 2 pies of the application package required in (1) a ) above shall be <br />submitted by the applicant. <br />(4) The Planning Board and /or Board of County Commissioners may req'cre: <br />additional information in order to evaluate and properly process the appl <br />for a CZD. <br />(D) Neighborhood Information Meeting 9 <br />(1) Before a Public Hearing may be held on an accepted application for a CZD, the <br />applicant is required to schedule, with the assistance of the Planning <br />Department, a minimum of one neighborhood information meeting. The purpose <br />of this meeting is to obtain surrounding property owner input and comments on <br />the proposed development project. <br />(2) The applicant shall obtain property owner mailing address information from the <br />Orange County 10and shall <br />mail certified notices of the meeting date and time to each property owner within <br />500 feet of the property for which a CZD has been requested. <br />The notices shall be mailed a minimum of 14 days prior to the date of the <br />proposed Neighborhood Information Meeting. <br />(4) i rie api3iicant sndii pv5t a siiiii vfi ti a, piy6c;rik ii4i`.c i W51 uaW. pi A <br />and tip° J the meeting a minimum of 10 days prior to the date of ti-, <br />11 <br />(5) The Neighborhood Information Meeting shall be held a minimum of 14 days prior <br />to the date of the Public Hearing where the application is scheduled for review <br />and public comment. <br />view and Evaluation of Application <br />The review, p ing, and evaluation of a CZD application is ative process <br />subject to judicial review he same procedures andards of review that apply <br />to general use district zoning decisi'o <br />(F) Approval and Conditions <br />(1) The a County Commissioners shall take action on the _a on to <br />------rezone the property in accordance with the procedures outlined within Sec <br />2.8. <br />9 Originally staff had anticipated amending this section to require a neighborhood information meeting to be held <br />45 days prior to a public hearing to review a CZD application. As the review of this type of application does not <br />involve a Special Use Permit and is completed through a legislative review process (i.e. no sworn expert <br />testimony), staff has determined existing review requirements are sufficient. <br />10 was added by staff to address a suggestion made by Commissioner Gordon via e -mail received <br />on November 17, 2014. <br />11 was added by staff to address a suggestion made by Commissioner Gordon via e -mail received <br />on November 17, 2014. <br />Orange County, North Carolina — Unified Development Ordinance Page 2 -30 <br />