Browse
Search
Agenda - 08-03-1995 - VIII-H
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 08-03-95
>
Agenda - 08-03-1995 - VIII-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 9:52:53 AM
Creation date
12/11/2014 9:52:46 AM
Metadata
Fields
Template:
BOCC
Date
8/3/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-H
Document Relationships
Minutes - 19950803
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
RES-1995-039 Resolution of Approval of Thomas Place Subdivision Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> A letter of credit, escrow agreement, or bond shall be submitted to secure <br /> construction of Percussion Drive and Stillwater Lane to the standards of the <br /> North Carolina Department of Transportation. An estimate of the construction <br /> cost must be prepared by a certified/licensed engineer or grading contractor <br /> and submitted to the Planning and Inspections Department. The financial <br /> guarantee must reflect 110% of that estimate and be issued by an accredited <br /> financial institution licensed to do business in North Carolina. <br /> The document describing development restrictions to be recorded with the <br /> Final Plat shall state that the financial guarantee will not be released until the <br /> road construction has been inspected and approved by NCDOT. <br /> 2. Submit an erosion control plan for construction of the road. <br /> 3. A sight triangle to NCDOT standards shall be shown at the intersection of <br /> Walker Road and Percussion Drive, and Stillwater Lane and Percussion Drive. <br /> 4. An approved street name sign shall be erected at the intersection of streets as <br /> required in Section IV-B-3-c-12 of the Orange County Subdivision <br /> Regulations. Evidence shall be submitted by the applicant that signs are in <br /> place or a copy of the receipt for purchase of the signs shall be submitted to <br /> the Planning Department. <br /> 5. All lots shall receive access from Percussion Drive or Stillwater Lane. <br /> C. Land Use Buffers and Landscaping <br /> 1. Landscaping shall be installed or preserved as indicated on the approved <br /> landscape plan, and must be inspected and approved by the Planning and <br /> Inspections Department. <br /> OR <br /> Guaranteed financially through a letter of credit, escrow agreement, or bond <br /> submitted to secure required landscape installation and preservation. An <br /> estimate of the cost for required preservation, plantings and their installation <br /> must be provided. The financial guarantee shall reflect 110 percent of the <br /> estimate and be issued by an accredited financial institution licensed to do <br /> business in North Carolina. <br /> 2. Provisions for protection of existing trees as shown on the approved landscape <br /> plan shall be included in a document describing development restrictions and <br /> requirements to be prepared by Planning Staff and recorded concurrently with <br /> the Final Plat. <br /> D. Drainage <br /> 1. A stream buffer shall be provided on lots 12, 13, 14, 15, 16, 17 and 25 as <br /> indicated on the preliminary plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.