Browse
Search
Agenda - 02-26-2008-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-26-2008
>
Agenda - 02-26-2008-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:53:41 AM
Creation date
8/28/2008 9:46:18 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2008
Document Type
Agenda
Document Relationships
Minutes - 20080226
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A #U'J*VDJ L <br />10 1 Did Lei <br />To: Laura Blackmon, County Manager <br />Willie Best, Assistant County Manager <br />From: David Stancil, E&RC Director <br />Lori Taft, Recreation and Parks Director <br />RE: Fairview Park Status Report <br />Date: February 18, 2008 <br />As the Board of County Commissioners prepares to meet with the Hillsborough <br />Town Board, we thought a brief update on the progress at Fairview Park might <br />be useful. In way of background, the master plan for this park was approved in <br />2006/2007 by the two boards. The Board of County Commissioners approved a <br />contract with the firm of Corley, Redfoot and Zack / Susan Hatchell in 2007 to <br />develop engineering, construction drawings and bid documents for the park. <br />The following is a summary of the status of the project: <br />❑ A grant application in the amount of $500,000 was developed and <br />transmitted to the N.C. Parks and Recreation Trust Fund on January 31 to <br />help fund park facility construction. Word on the grant should be received <br />by May (first grant awards) or July (subsequent awards). <br />❑ The consultants have been meeting with staff weekly to review work on <br />the final design and construction documents. <br />❑ In the next few months, application will be made to the town for site plan <br />review and approval. By the summer, results of the grant application will <br />be known and the project should go out to bid during the summer months. <br />A construction contract should be ready for approval by Fall 2008 <br />❑ Following execution of the contract (late-fall 2008), a Groundbreaking <br />Ceremony would be held on site. <br />❑ Construction would continue through the year, and should be complete in <br />less than 12 months. Theoretically, the park could open during the <br />summer/fall of 2009. <br />❑ County and Town staff have held a meeting to discuss ideas for the <br />operation of the park (please see attached letter). <br />Please let us know if we can provide any additional information. <br />Copies: Marabeth Carr, Landscape Architect <br />
The URL can be used to link to this page
Your browser does not support the video tag.