Browse
Search
Agenda - 02-26-2008-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-26-2008
>
Agenda - 02-26-2008-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:53:41 AM
Creation date
8/28/2008 9:46:18 AM
Metadata
Fields
Template:
BOCC
Date
2/26/2008
Document Type
Agenda
Document Relationships
Minutes - 20080226
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff will provide any other information at the meeting, and the Boards can discuss these <br />projects as necessary. <br />No Attachments <br />b) County Campus <br />Gateway Center <br />The developer has completed the Gateway Center and a Certificate of Occupancy has been <br />received for Suites 200 and 300 (second and third floors). The Revenue and Tax <br />Assessor/Land Records departments will occupy the second floor. The Register of Deeds <br />along with the Land Records staff associated directly with the Register of Deeds' operations will <br />occupy the third floor. <br />Over the next month, the County will stage the furniture and put finishing touches on the <br />Gateway space. Relocation of the departments will be completed March 15 through March 18, <br />and the offices will open in their new location on March 19. A public information effort is being <br />coordinated through the staff of the Clerk to the Board of Commissioners' office. <br />Parking <br />Parking and traffic at the site has been the subject of considerable discussion. The developer <br />has arranged for the County to temporarily use the Weaver Street Market parking lot until such <br />time the parking deck is opened to the public. The parking deck is tentatively scheduled to <br />open to the public in early to mid-April in advance of Weaver Street Market's opening by early- <br />May 2008. The traffic signal to be installed at Churton Street and Nash and Kollock Streets will <br />not be installed prior to the County's move to the Gateway Center. The County will instruct <br />employees in ways to access the site that will minimize potential congestion on Churton Street. <br />It is County staffs understanding the traffic signal will be installed prior to Weaver Street <br />Market's opening. <br />The parking deck will remain in the ownership of the developer, with the County receiving a <br />license to use approximately 200 spaces as designated in the various agreements between the <br />parties. The County Commissioners will be considering approval of a License Agreement prior <br />to the public opening of the deck. Of the approximately 400 spaces on the parking deck, the <br />developer will offer approximately 200 spaces for pay-by-the-hour public parking. The spaces <br />licensed to the County will also be available for pay-by-the-hour parking when not in use by the <br />County. <br />Library and Office Building <br />Final work on the plans for both the library and the office building is being completed by the <br />architect and the plumbing, mechanical, and electrical engineers. The developer expects to <br />commence construction within the next several weeks, with essentially simultaneous completion <br />of the buildings anticipated for early-2009. A ground-breaking ceremony for the buildings is <br />being planned and should occur within the next few weeks as well. <br />Staff will provide any other information at the meeting, and the Boards can discuss the projects <br />listed above as necessary. <br />No Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.