Orange County NC Website
and black striped warnina tape or a suitable warnina barrier, as <br />well as alacina RF radiation signs as needed and appropriate to <br />warn individuals of the potential danger; <br />17) A signed _statement that the applicant will expeditious) <br />remedy ar-v physical or RF interference with other <br />telecommunications or wireless devices or services caused by <br />the new installation. <br />18) The applicant shall provide a certification by a Professional <br />Engineer licensed in the State, along with documentation (a <br />-- <br />structural analysis). including calculations. that grove that the <br />wireless support structure and its foundation as proaosed to be <br />utilized are designed and were constructed to_meet all County. <br />State federal and ANSI structural requirements for loads. <br />including wind and ice loads and the placement of anv <br />equipment on the roof a building after the addition of the <br />proaosed new facilities. ' <br />19) Anv application that proposes to .locate a facility on County <br />owned or leased property shall contain a provision with respect <br />to indemnification. Such provision shall require the applicant. to <br />-- <br />the extent permitted by law. to at all times defend. indemnify. <br />protect, save, hold harmless, and exempt the Countv. and its <br />compensatory or punitive. or expenses arising there from. either <br />at law or in equity. which might arise out of. or are caused bv. <br />the placement, construction erection modification location. <br />however, anv portion of such claims suits demands causes of <br />action or award of damages as may be attributable to the <br />negligent or intentional acts or omissions of the County. or its <br />servants or agents. With respect to the penalties, damages or <br />- <br />charges referenced herein. reasonable attorneys' fees. <br />consultants' fees, and expert witness fees are included in those <br />costs that the Countv can recover. Notwithstanding the <br />requirements noted above, an indemnification provision will not <br />be required in those instances where the County itself applies <br />for and secures a Special Use Permit for a wireless facility. <br />e) Aaplications for administrative approval of telecommunication <br />wireless facilities shall demonstrate compliance with the following <br />design criteria: <br />1) In order to protect the nature and character of the community <br />wherein the facility is proposed and in order to create the <br />--- <br />least visually intrusive impact reasonably possible, anv <br />