Browse
Search
Agenda - 06-26-1995 - VIII-G
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1995
>
Agenda - 06-26-95
>
Agenda - 06-26-1995 - VIII-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2014 4:45:45 PM
Creation date
12/8/2014 4:45:38 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1995
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-F
Document Relationships
1995 NS County Manager - Amendment to Interlocal Agreement for Triangle Area Water Supply Monitoring Project - Agenda 6-26-1995 - VIII-G
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1995
Minutes - 19950626
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> Attachment B <br /> Recommendations for Extending and Modifying the Program _ <br /> Workillan#1 <br /> The Triangle Area Water Supply Monitoring Project has made significant progress <br /> toward its original goals. It has provided a solid basis for measuring long-term changes <br /> in water quality,and expanded our information about synthetic organic chemicals in <br /> the Triangle Area's'water supplies.Much of this data will be of value to local utilities in <br /> meeting new monitoring requirements under the Safe Drinking Water Act and in <br /> developing strategies for protecting and treating local drinking water supplies. <br /> Based on the first five years of monitoring data, sampling frequency may be reduced <br /> for major ions,nutrients,and trace metals without losing valuable statistical data. This <br /> change in sampling frequency will allow the Project to expand the number of <br /> constituents monitored at intake areas and to focus on those constituents EPA has <br /> designated as most important(or of most concern)in drinking water.It will also <br /> provide the needed flexibility to address emerging issues, such as cryptosporidium, <br /> and to enhance the Project's pollutant loading analysis through continued storm event <br /> monitoring and the addition of a stream flow gauge. <br /> The Project Steering Committee,composed of representatives from each participating <br /> local government, recommends the following specific changes to the Project: <br /> A. Streams,: Sample physical properties,major ions and nutrients 6 times per year and <br /> trace metals 2 times per year at intake sites and other USGS sites. (years 1, 2, 3, and4). <br /> B. Lakes: Sample physical properties,major ions,nutrients,and chlorophyll a 5 times <br /> per year and trace metals 2 times per year. (years 1,2, 3,and 4) <br /> USGS would reduce major ions and nutrient monitoring at its sites from 12 to 6 <br /> times per year. This "rotational approach"allows the Project to focus more resources <br /> on EPA's Phase II and Phase V(Safe Drinking Water)regulated constituents at <br /> intake areas.The Committee believes,given the existing Project database, the <br /> proposed monitoring frequency and sites for Phase III will maintain statistical <br /> validity while freeing up resources for other monitoring and reducing the City of <br /> Raleigh's project cost. <br /> C. 13 DEM Sites.The remaining stream and reservoir sites in the network will be <br /> sampled by DEM.DEM will sample 13 sites 12 times per year for nutrients and less <br /> frequently for trace metals and major ions.The State's ambient monitoring program is <br /> subject to change based on its level of funding. (years 1, 2, 3,and 4) <br /> Attachment C.1 is a map of the Triangle Area Water Supply Monitoring Sites. <br /> D. Collect samples for analysis of cryptosporidium and giardia once per year at 10 <br /> intake sites and 10 selected tributary sites. (years 1,2, and 3) <br /> There has been increasing awareness and concern about the potential of future <br /> outbreaks and increasing likelihood of EPA regulation. The Phase III monitoring of <br /> cryptosporidium and giardia would continue the work begun in FY94-95. <br />
The URL can be used to link to this page
Your browser does not support the video tag.