Browse
Search
Agenda - 02-19-2008-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:49:50 AM
Creation date
8/28/2008 9:44:36 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />PROJECT TIME LINE PROJECTION <br />BOCC approves initiation of process to advertise and hold a public <br />hearing on the Engineer's Report for the scope of construction for <br />the northern Buckhorn/central Efland sewer expansion project. 2/19/08 <br />BOCC holds public hearing at its first available regular meeting 3/18/08 <br />BOCC directs that scope of project outline in the Engineer's Report <br />be modified or submitted as presented 4/1/08 <br />Engineering Consultant submits unmodified Engineer's Report to NC <br />Construction Loans and Grants Section 4/8/08 <br />Construction Loans and Grants Section completes review of Engineer's <br />Report and forwards the report and its findings to review agencies 7/8/08 <br />Review agencies complete review of Engineer's Report and forward <br />their findings back to the Construction Loans and Grant Section 9/8/08 <br />Engineering Consultant submits construction plans and specifications <br />to Construction Loans and Grants Section ' 9/15/08 <br />Construction Loans and Grants Section forwards reports and findings <br />to US EPA for review and award of grant funding, completed by 11/11/08 <br />Construction Loans and Grants Section authorizes advertising project for <br />Bidding 11/18/08 <br />County advertises the project for Bidding 11/25/08 <br />County completes purchase of easements in the railroad right-of-way 12/5/08 <br />Bids are opened 1/6/09 <br />Bids are submitted for BOCC approval 2/17/09 <br />Notice to Proceed issued 3/17/09 <br />Construction complete, system operational <br />9/17/2009 -3/17/2010 <br />If I may provide any additional information or clarification of this information, please <br />advise.
The URL can be used to link to this page
Your browser does not support the video tag.