Browse
Search
Agenda - 02-19-2008-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:49:50 AM
Creation date
8/28/2008 9:44:36 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />planned, the Budget Director indicates that the County can essentially borrow money from FY <br />2010-11 to cover costs incurred in the prior fiscal year. <br />The process involved for State and Tribal Assistance Grants (STAG) funding of the Buckhorn <br />utility project requires that a public hearing be held on the Preliminary Engineering Report. The <br />requirements for that hearing and for reporting the outcome of the hearing are as outlined <br />below: The public hearing must be held prior to submitting the Engineer's Report (the first step <br />in the formal state/federal project review/approval process) for review. <br />Advertisements for Efland and Buckhorn projects are placed in the Chapel Hill Herald and the <br />Mebane Enterprise. The Herald is a daily paper and the Enterprise is a weekly paper that <br />comes out on Wednesday's. For the ad to appear in either the Herald or Enterprise, the <br />advertisement has to be given to the paper the Friday before the Wednesday the add appears. <br />If the Board approves the advertising for a public hearing on February 1 gth, the advertisement <br />can appear on February 27th for a hearing no sooner than March 12th. If the BOCC wants the <br />public hearing to occur during a regular meeting of the Board, it could occur either at the March <br />18th or the April Vt meetings <br />Public Participation <br />1. One public hearing, with a 2-week notification, is required. <br />• A copy of the Engineering Report should be available for review by the public at <br />least 2 weeks prior to the public hearing <br />2. An advertisement for the hearing shall be placed in a newspaper having local area <br />circulation, and should include the following information: <br />• Identify the time and location of the public hearing <br />• Advise when and where a copy of the Engineering Report can be reviewed <br />• Provide a brief description of the proposed project <br />• Advise how much funding is required and identify the source of funding <br />3. The information presented during the public hearing must: <br />• Identify the problem <br />• Discuss the selected alternative <br />• Identify the amount of the anticipated loan or grant <br />• Discuss any required inter-local agreements <br />• Identify the effect this project will have on the monthly sewer bill for a typical <br />residential user of 5000 gallons per month <br />4. Provide a summary of the hearing <br />5. Provide an affidavit of publication of the hearing notice <br />The preliminary Engineering Report is in hand at this time and will be made available for public <br />viewing as appropriate. Given that there is a requirement for at least fourteen days notice, it is <br />necessary for the BOCC to approve the public hearing at this time so that staff can advertise <br />the hearing for the March 18, 2008 or April 1, 2008 regularly scheduled BOCC meetings.
The URL can be used to link to this page
Your browser does not support the video tag.