Browse
Search
Agenda - 12-09-2014-13 (3)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2014
>
Agenda - 12-09-2014 - Regular Mtg.
>
Agenda - 12-09-2014-13 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:44:48 PM
Creation date
12/5/2014 10:43:30 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2014
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
13-3
Document Relationships
Minutes 12-09-2014
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION ITEM <br />1 <br />PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />Administration 131 W. Margaret Lane <br />(919) 245 -2575 �'� '� Suite 201 <br />(919) 644 -3002 (FAX) ORANGE COUNTY P. O. Box 8181 <br />www.orangecountync.gov NORTH CAROLINA Hillsborough, NC 27278 <br />MEMORANDUM <br />TO: Board of County Commissioners; Bonnie Hammersley, County <br />Manager <br />FROM: Craig Benedict, Planning Director; Howard Fleming, Engineering and <br />Stormwater Supervisor <br />CC: John Roberts, County Attorney <br />DATE: November 21, 2014 <br />SUBJECT: Efland to Mebane, Buckhorn- Mebane EDD, Phase 2 Extension & <br />West Ten Road Pump Station & Outfall (AKA CIP #44) <br />This memo serves as a brief status report of the progress of the above project. The <br />attached letter from the County Engineering / Stormwater Supervisor, Howard W. <br />Fleming Jr., PE and our engineering design consultant, Hobbs - Upchurch, explains the <br />progress and alignment. <br />We have begun to contact the community that will be affected by this project and our <br />area meeting of November 20, 2014 was productive and positive. The attorney's office <br />is assisting with easement acquisition. We plan to have the project ready for Board <br />approval in February or March 2014. <br />The City of Mebane has been our partner in reviewing the design and specifications <br />since they will eventually be the responsible maintenance entity. <br />This project serves 2 purposes: One, to redirect the Efland sewer flow which stabilizes <br />future sewer rates for county residents and businesses and reduces County operational <br />expenses; and two, provides sewer backbone infrastructure for over 350 acres (with <br />expansion capability for 350 additional acres) of economic development opportunity <br />north of West Ten Road and 1- 85/1 -40 in the Efland area in the water and sewer <br />boundary area. <br />Note: I have not included engineering drawings noted in Mr. Fleming Jr.'s letter as <br />items 4 through 7 but they are available if requested. <br />If you have any questions please call my office. <br />Thank you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.