Browse
Search
Agenda - 02-19-2008-4j3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:48:18 AM
Creation date
8/28/2008 9:43:41 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j3
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
change in the Project shall be determined in one or more of the <br />following ways: <br />7.3.1.1 By mutual acceptance of a lump sum, properly itemized <br />and supported by cost data; or <br />7.3.1.2 By unit prices defined in a contract with a Contractor, or <br />7.3.1.3 By the cost of such Work determined on the basis of <br />the cost records for the changed work. In the event actual <br />costs are to be reimbursed, the CMAR shall keep and present <br />in such form as may be agreeable to the Owner and Designer <br />an itemized accounting together with appropriate supporting <br />data of the actual Cost of the Work. <br />7.3.2 Directive to Proceed <br />In the event the CMAR and the Owner cannot agree that an <br />adjustment to the Guaranteed Maximum Price or the Master <br />Schedule is warranted, or cannot agree on the compensation <br />for a change in the Work or on an increase in the Guaranteed <br />Maximum Price, the CMAR shall, if so directed by the Owner in <br />writing, nevertheless proceed with the Work, and any <br />adjustment to the Guaranteed Maximum Price shall be <br />negotiated by the parties at a later date, utilizing the dispute <br />resolution procedures under this Agreement if necessary. <br />7.3.3 Unit Prices <br />If unit prices are utilized in the Guaranteed Maximum Price, the <br />Guaranteed Maximum Price Proposal shall document the <br />estimates on which the unit prices are based. If the CMAR <br />later determines that the quantities on which unit prices are <br />based will. vary from the quantities utilized by the CMAR to fix <br />the unit prices and calculate the Guaranteed Maximum Price, <br />the CMAR shall within five (5) days after determining that the <br />quantities will vary from the estimates notify the Designer and <br />the Owner in writing and forecast the amount of the variance. <br />If the estimated quantities available to and used by the CMAR <br />to establish the unit prices are so changed that application of <br />the agreed unit prices to the quantities or work proposed cause <br />substantial inequity to the Owner or the CMAR, the applicable <br />unit prices and Guaranteed Maximum Price shall be adjusted. <br />7.3.4 Unforeseen Conditions <br />Should the CMAR encounter unforeseen conditions at the <br />Project site materially differing from those shown on the <br />Drawings or indicated in the Specifications or differing <br />materially from those ordinarily encountered and generally <br />recognized as inherent in work of the character provided for in <br />this Agreement, the CMAR shall immediately, and in no event <br />more than five (5) days later; give notice to the Owner of such <br />conditions before they are disturbed. The Owner and the <br />Designer shall thereupon promptly investigate the conditions <br />and if they find that they materially differ from those shown on <br />the Drawings or indicated in the Specifications, they shall at <br />once make such changes in the Drawings and/or Specifications <br />as they may find necessary. Any increase or decrease in the <br />Guaranteed Maximum Price resulting from such changes shall <br />be adjusted in the manner provided herein for adjustments as <br />to extra and/or additional Work and changes. However, neither <br />the Owner nor the Designer shall be liable or responsible for <br />additional work, costs, or changes to the Work that could have <br />been reasonably determined from any reports, surveys, and <br />analyses made available for the CMAR's review or that could <br />have been discovered by the CMAR through the performance <br />of its obligations pursuant to the Contract Documents. <br />7.3.5 Minor Changes <br />The Designer shall have the authority to order minor changes <br />in the Project consistent with the intent of the Drawings and <br />Specifications and not involving an adjustment in the <br />Guaranteed Maximum Price or change of the construction <br />completion date. Such changes may be affected by written <br />order only. <br />7.4 Fixed Fee and General Conditions Costs <br />The Owner shall compensate the CMAR for the CMAR's Fixed <br />Fee and reimbursable General Conditions Costs in accordance <br />with the terms and conditions of this Agreement as specifically <br />as follows: <br />7.4.1 Fixed Fees <br />The Fixed Fees payable to the CMAR shall be: <br />Thirty Thousand Dollars ($30,000) for the pre-construction and <br />procurement phases which amount is included in the GMP <br />provided the GMP is accepted by the Owner. If the GMP is not <br />accepted by the Owner the CMAR is entitled to the cost of <br />services rendered not to exceed $30,000; and, for the, <br />construction and post-construction phases, a fee equal to five <br />percent (5%) of the Cost of the Work set forth in the original <br />agreed Guaranteed Maximum Price. In the event the original <br />agreed Guaranteed Maximum Price is adjusted between the <br />time it is fixed and the end of the Project, the Fixed Fee shall <br />23
The URL can be used to link to this page
Your browser does not support the video tag.