Browse
Search
Agenda - 02-19-2008-4j2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:12 AM
Creation date
8/28/2008 9:43:40 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j2
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Estimate Report <br />07042 OCAS <br />Total <br />Item Description Takeoff Qty Amount <br />2215 Fine Grading <br /> 40 Fine Grade Curb & Gutter 1,762.00 if 3,736 <br /> 50 Fine Grade Sidewalks 2,500.00 sf 1,296 <br /> 50 Fine Grade Sidewalks 7,557.00. sf 3,916 <br /> Fine Grading 24,655 <br /> 452.492 Labor hours <br /> 132.116 Equipment hours <br />2250 Rock Excavation <br /> 30 Rock Excavation - Allowance 1.00 is 10,100 <br /> Rock Excavation 10,100 <br /> 0.20 Labor hours <br /> 0.20 Equipment hours <br />2255 Unsuitable Material Excav <br /> 10 Unsuitable Material Excavation - 1.00 Is 10,100 <br /> Allowance <br /> Unsuitable Material Excav 10,100 <br />2270 Erosion Control <br /> 10 Construction Entrance 1.00 ea 2,020 <br /> 20 Silt Fence 895.00 If 5,201 <br /> 30 Diversion Ditch / Earth Berms 500.00 If 3,368 <br /> 40 Inlet Protection 20.00 each 3,438 <br /> 50 Sediment Basin 200.00 cy 4,858 <br /> 80 Temporary Seeding 4.00 acre 6,060 <br />---- Rip Rap Aprons 6.00 ea 2,727 <br />---- Rip Rap 30.00 ton 1,364 <br /> Erosion Control 29,036 <br /> 358.655 Labor hours <br /> 53.571 Equipment hours <br />2536 Subdrain <br /> 10 Foundation Drain 803.00 If 10,544 <br /> Subdrain 10,544 <br />2551 Water System <br /> 10 Water Systems 527.00 if 63,874 <br /> 10 Water Systems 1,181.00 If 83,499 <br /> Water System 147,373 <br />2552 Storm Drain <br /> 10 Storm Drain 50.00 if 4,545 <br /> 10 Storm Drain 1,177.00 if 106,992 <br /> 10 Biofiltration Cell & Detention 1.00 Is 40,401 <br /> Area <br /> Storm Drain 151,938 <br />2553 Sanitary Sewer <br /> 10 Sanitary Sewer 434.00 If 13,151 <br />Clancy & Theys Const. Co. <br />21121200811:05 AM <br />Paae 3
The URL can be used to link to this page
Your browser does not support the video tag.