Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) Make good any Work or material, or any equipment or contents disturbed in <br />fulfilling any such guarantee. <br />If, in fulfilling the requirements of the Contract Documents or of any guarantee embraced <br />therein or required thereby, the Contractor disturbs any work, facility, premises, or <br />construction belonging to the Owner, the Contractor shall restore such disturbed work, <br />facility, premises or construction to a condition satisfactory to the Owner, and shall <br />guarantee such restored work to the same extent as if it were Work under the Contract <br />Documents. <br />If the Contractor, after notice, fails to proceed promptly to comply with the terms of the <br />guarantee, the CMAR may have the defects corrected, and the Contractor and the <br />Contractor's sureties shall be liable for all expenses incurred. "Promptly" is defined as <br />within twenty-four (24) hours for systems necessary to normal operation of the building and <br />within seventy-two (72) hours for all other items. All special guarantees applicable to <br />definite parts of the Work that may be shown in or required by Contract Documents shall be <br />subject to the terms of this paragraph during the first year of the life of such special <br />guarantee. Manufacturer's standard guarantees or warranties which do not comply with the <br />time limit specified herein shall be extended by the Contractor automatically without further <br />action on the part of the CMAR. <br />18.4 In the eleventh calendar month after Substantial Completion of the entire Project, and at <br />the request of the CMAR, the Contractor, the CMAR, the Owner and the Designer shall <br />make an inspection of the Work for the purpose of identifying defective workmanship <br />and/or materials. If the Contractor, having been requested to do so by the CMAR, fails to <br />participate in such inspection, the Contractor shall be conclusively bound by any' decision <br />or ruling by the Designer as to any defective workmanship or material and as to the <br />Contractor's responsibility for its repair or replacement. <br />ARTICLE 19. CMAR'S RIGHT TO DO WORK <br />19.1 If, during the progress of the Work or during any period of guarantee, the Contractor fails to <br />prosecute the Work properly or to perform any provision of the Contract Documents, the <br />CMAR, after three (3) days written notice to the Contractor from the CMAR, may perform or <br />have performed that portion of the Work and may deduct the cost thereof from any amount <br />due or to become due the Contractor. Notwithstanding any action by the CMAR under this <br />paragraph, all warranties and bonds given or to be given by the Contractor shall remain in <br />effect or shall be given by the Contractor. <br />19.2 Should the cost of such action by the CMAR exceed the amount due or to become due the <br />Contractor, the Contractor and the Contractor's sureties shall be liable for and shall pay to <br />the CMAR the amount of such excess. <br />ARTICLE 20. PARTIAL PAYMENTS <br />20.1 Within thirty (30) days after initial receipt of the Construction Agreement by the Contractor <br />for signatures the Contractor shall submit to the CMAR a Schedule of Values. The <br />Schedule of Values shall indicate the value of the Work, including applicable overhead and <br />profit, for each Division and section of the Project Specifications. The CMAR shall be <br />provided with the Contractor's estimate papers, Subcontractor agreements, supplier <br />quotes, or other documents substantiating these values if so requested in writing by the <br />CMAR. The Contractor shall provide the requested documentation within seven (7) days <br />after receipt of the CMAR's written request. The Schedule of Values shall be subject to <br />approval by the CMAR and the Owner, and if the CMAR and the Contractor cannot agree <br />upon the Schedule of Values, the Designer shall prepare it, and the Schedule of Values as <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 34 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.