Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
whereupon the Contractor shall so proceed and keep accurately, in such form as may <br />be required by the CMAR, a correct account of costs together with all proper invoices, <br />payrolls, and supporting data therefore. <br />15.4 Where the Contract Price is to be adjusted, the following limitations shall apply in <br />determining the amount of adjustment: <br />(a) In the case of extra or emergency work, the Contract Price shall not be increased by <br />more than the reasonable, actual, and documented net cost of the extra or emergency <br />work plus ten percent (10%) of such net cost on Work performed by the Contractor and <br />five percent (5%) thereof on any subcontracted Work for overhead and profit combined. <br />(b) In the case of a decrease in Work, the Contract Price shall not be decreased by less <br />than the net cost of the deleted Work plus five percent (5%) of such direct net cost for <br />profit and overhead. <br />The term 'net cost' as used herein shall include, as applicable, and shall be limited to, all <br />direct labor, direct material, direct equipment, labor burden, sales taxes, shipping and <br />handling charges, permits and fees, and' insurance and bond premium adjustments, if any, <br />attributable to the change. All other items of cost shall be considered as overhead and <br />covered by the percentages allowed in sections (a) and (b) of this paragraph. <br />The Contractor shall provide worksheets or tabulations describing the method by which the <br />direct net cost was calculated, and shall provide all data needed to support the calculation <br />of the direct net cost, all in a form acceptable to the CMAR. <br />ARTICLE 16. UNFORESEEN CONDITIONS <br />16.1 Should the Contractor encounter unforeseen conditions at the Project site materially <br />differing from those shown on the Drawings or indicated in the Specifications or differing <br />materially from those ordinarily encountered and generally recognized as inherent in work <br />of the character provided for in this Agreement, the Contractor shall immediately, and in no <br />event more than three (3) days later, give notice to the CMAR of such conditions before <br />they are disturbed. The CMAR shall thereupon promptly notify the Designer and Owner <br />and investigate the conditions. The CMAR shall as soon as practicable request that the <br />Designer make such changes in the Drawings and/or Specifications as the CMAR and the <br />Contractor believe are necessary to continue the Work. Any increase or decrease in the <br />Contract Price resulting from such changes shall be adjusted in the manner provided <br />herein for adjustments as to extra and/or additional Work and changes. The CMAR shall <br />not be liable or responsible for additional work, costs, or changes to the Work that could <br />have been reasonably determined from any reports, surveys, and analyses made available <br />for the Contractor's review or that could have been discovered by the Contractor through <br />the performance of its obligations pursuant to the Contract Documents. <br />ARTICLE 17. CORRECTION OF WORK BEFORE FINAL PAYMENT <br />17.1 The Owner and the CMAR have the authority to stop or suspend Work and to order Work <br />removed or to order corrections of defective Work or Work not in compliance with the <br />Contract Documents where such action may be necessary to ensure successful completion <br />of the Work. <br />Any work, materials, fabricated items, or other parts of the Work which have been found by <br />the CMAR, the Owner or the Designer to be defective or not in accordance with the <br />Contract Documents shall be condemned and shall be removed from the Project by the <br />Contractor, and immediately replaced by new Work in accordance with the Contract <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 32 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.