Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.16 The Contractor specifically recognizes that a delay by the Contractor in achieving any <br />Completion Date can have the effect of delaying the Substantial Completion of the Project, <br />or could force the CMAR to accelerate the Contractor's Work or the work of other <br />contractors. Such delay in achieving a Completion Date will necessarily cause damages, <br />losses, and expenses to the CMAR, including, but not limited to and by way of illustration <br />only, liquidated damages payable to the Owner, damages payable to other contractors, <br />increased and extended Project overhead, increased fees, increased costs of construction, <br />increased and extended operation costs of other facilities, and inefficiency and loss of <br />productivity. Such damages, losses, and expenses may be recovered from the Contractor <br />and, if the Contractor is bonded, its surety. <br />13.17 The sum for liquidated damages payable to the Owner is the amount stipulated in the <br />CMAR Contract and reasonably estimated in advance to cover the losses to be incurred by <br />the Owner by reason of failure of said CMAR and the Contractor(s) to complete the Project <br />within the time specified in the Construction Management Contract, such time being in the <br />essence of this Agreement and a material consideration thereof. <br />ARTICLE 14. CHANGES IN THE WORK <br />14.1 Without invalidating the Contract Documents, the CMAR may, at any time, or from time to <br />time order additions, deletions, or revisions in the Work. Said additions, deletions, or <br />revisions shall be authorized only by written Change Orders, Construction Change <br />Directives or Field Orders. Upon receipt of a Change Order, Construction Change Directive <br />or Field Order, the Contractor shall proceed with the Work involved. All such Work shall be <br />executed under the applicable conditions of the Contract Documents. If any change causes <br />an increase or decrease in the Contract Price and/or an extension or shortening of the <br />Contract Time, adjustments shall be made as provided in Article 14 and/or Article 15 of <br />these General Conditions. <br />14.2 If possible, Work shall not begin on any change or alteration to the Work until a written <br />Change Order is executed settling any change in the Contract Price or Contract Time. In <br />the event the Contractor and the CMAR cannot agree that an adjustment to the Contract <br />Price or the Contract Time is warranted, or cannot agree on the appropriate adjustment to <br />the Contract Price or the Contract Time, in order to expedite the Work and avoid or <br />minimize delay in the Work that might affect the Contract Price or Contract Time, the <br />Contractor shall, if so directed by the CMAR in writing, nevertheless proceed with the Work, <br />and any adjustment to the Contract Price or Contract Time shall be negotiated by the <br />parties at a later date, utilizing the dispute resolution procedures under this Agreement if <br />necessary. Any claim for an adjustment in Contract Price or Contract Time, if not defined in <br />the Construction Change Directive, shall be promptly made in writing in accordance with <br />the procedures defined in Article 15.2 of these General Conditions. <br />14.3 The Designer, through the CMAR, may authorize minor changes or alterations in the Work <br />not involving change in the Contract Price or in the Contract Time and not inconsistent with <br />the overall intent of the Contract Documents. These may be accomplished by a Field <br />Order. Such alterations shall not invalidate the Contract Documents nor release the surety. <br />If the Contractor believes that any minor change or alteration authorized by the Designer <br />entitles the Contractor to an increase in the Contract Price and/or an extension of Contract <br />Time, the Contractor may make a claim therefore as provided in Article 14 and/or Article 15 <br />of these General Conditions. <br />14.4 Except in an emergency endangering life or property, no change shall be made by the <br />Contractor except upon prior written Change Order, Construction Change Directive or Field <br />Order authorizing such change. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 29 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.