Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor. It shall be necessary for the Contractor to coordinate construction activities with <br />such other contractors, particularly with respect to access to work areas, storage of <br />materials, and use of elevators and other common facilities. The Contractor shall diligently <br />and in good faith cooperate with the CMAR, the Owner, the Designer, and all other <br />contractors with respect to such matters and shall regularly and faithfully attend any and all <br />meetings called by the CMAR with respect to such matters. Any disputes between the <br />Contractor and any other separate prime contractor with respect to such matters shall be <br />resolved in accordance with the claim and dispute resolution procedures in the Agreement. <br />ARTICLE 13. CONTRACT TIME <br />13.1 Within fourteen (14) days after initial receipt of the Construction Agreement by the <br />Contractor for signatures, the Contractor shall prepare and submit to the CMAR for review <br />and approval a preliminary Contractor's Construction Schedule for the Work pursuant to the <br />requirements stated in the Contract Documents. <br />13.2 Within fourteen (14) days after initial receipt of the Construction Agreement by the <br />Contractor for signatures, the Contractor shall submit to the CMAR a Submittal Register <br />listing all Submittals the Contractor is required to make or proposes to make under the <br />Contract Documents, the dates on which the Contractor proposes to make such Submittals <br />and the dates by which the Contractor reasonably requires a response from the CMAR and <br />the Designer with respect to each Submittal. The dates submitted shall be incorporated into <br />the Contractor's Construction Schedule as Completion Dates when they have been <br />approved or modified by the Owner. The CMAR and the Designer shall not be required to <br />review any Submittal from the Contractor until a Submittal Register acceptable to and <br />approved by the CMAR has been submitted by the Contractor. <br />13.3 Not later than thirty (30) days following execution and delivery of the Construction <br />Agreement by the CMAR to the Contractor, the CMAR shall deliver to the Contractor a <br />Notice to Proceed. The Notice to Proceed shall state a commencement date on which it is <br />expected that the Contractor will begin the Work to be performed under the Agreement. <br />The Contract Time shall be measured from said specified commencement date. The <br />commencement date stated in the Notice to Proceed shall not be earlier than three (3) days <br />after the Notice to Proceed is served on the Contractor. <br />If, other than by mutual agreement, said specified commencement date is more than thirty <br />(30) days after the date of execution and delivery of the Agreement from the CMAR to the <br />Contractor and the Contractor believes said delay justifies an increase in Contract Price <br />and/or an extension of Contract Time, the Contractor. may make a claim therefore as <br />provided in Article 14 and/or Article 15 of these General Conditions. <br />No Work shall be done prior to the date specified in the Notice to Proceed. <br />The Contractor shall submit a final Contractor's Construction Schedule for approval by the <br />CMAR no later than fourteen (14) days after issuance of the Notice to Proceed. No <br />payments shall be due the Contractor until this schedule is approved by the CMAR. <br />13.4 The Master Schedule is a Contract Document. The Contractor represents that the Master <br />Schedule has been reviewed in detail and taken into account in preparing its bid. The <br />Contractor's Construction Schedule shall be incorporated into the CMAR's Project Master <br />Schedule. The Contractor's Construction Schedule shall include all of its activities which <br />impact, limit, or otherwise affect the time of completion of the Project as shown in the <br />Master Schedule, and all of the activities of others which impact, limit, or otherwise affect <br />the start, duration, or completion of the Contractor's activities. The Contractor further <br />represents that the Contractor can and will complete each activity within the time shown for <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 26 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.