Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work, however, the Contractor may be required to build or set sleeves, inserts, chases or <br />other components of the Work needed for mechanical, plumbing, electrical or other work by <br />other contractors. <br />7.33 The Contractor shall be responsible for permanently fixed service facilities and systems in <br />use during progress of the Work and shall strictly adhere to the following procedures: <br />a) Prior to acceptance of the Work by the Owner, the Contractor shall remove and <br />replace any part of the permanent building systems damaged through use during <br />construction. <br />b) Temporary filters shall be installed in each of the heating and air conditioning units, <br />return air grilles, and other locations to prevent intrusion of dust, dirt, and debris <br />during construction. Temporary filters shall be removed and replaced with new <br />filters immediately prior to Substantial Completion. <br />C) Extra effort shall be maintained to keep the building clean and under no <br />circumstances shall air systems be operated if finishing operations are creating <br />dust in excess of what would be considered normal if the building were occupied. <br />d) When the permanent lighting system is used during construction, lamps shall be <br />replaced and shall be new on the date of Substantial Completion. <br />ARTICLE 8. OWNER <br />8.1 The Owner shall issue communications and notices to the Contractor through the CMAR to <br />the extent contemplated by the Contract Documents. <br />8.2 In case of termination of the employment of the Designer, the Owner shall appoint as <br />Designer a qualified person who shall have and assume all rights and duties held by the <br />original Designer. <br />8.3 The Owner shall have the right to take possession of and use any portion of the Work <br />notwithstanding the fact that the time for completion of such portion of the Work may not <br />have expired, but such taking possession and use shall not be deemed an acceptance of <br />any Work not completed in accordance with the Contract Documents. <br />8.4 A waiver on the part of the Owner of any breach of any part of the Agreement by the <br />Contractor shall not be held to be a waiver of any other or subsequent breach. <br />8.5 The Owner shall pay all permanent acreage fees, governmental impact fees, and meter <br />deposits for permanent utilities. <br />ARTICLE 9. CONSTRUCTION MANAGER <br />9.1 The Owner has engaged the CMAR for the purpose of (i) assisting the Owner and <br />Designer in developing and administering budgets and cost controls, (ii) in evaluating <br />constructability and value engineering proposals, (iii) in establishing and maintaining a <br />critical path method (CPM) schedule, (iv) in coordinating and/or expediting all Work on the <br />Project, (v) in coordinating all Work on the Project with other projects being constructed by <br />the Owner or others adjacent to or near the Work, and (vi) for such other purposes as the <br />Owner may deem appropriate. <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 24 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.