Browse
Search
Agenda - 02-19-2008-4j1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 02-19-2008
>
Agenda - 02-19-2008-4j1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:47:06 AM
Creation date
8/28/2008 9:43:09 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2008
Document Type
Agenda
Agenda Item
4j1
Document Relationships
Minutes - 20080219
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specified quality, or take such other corrective action as the CMAR may direct. No change <br />in the Contract Price or in Contract Time shall be made as a result of authorizing a change <br />in methods or equipment under this paragraph. <br />7.6 All materials and equipment shall be new, except as otherwise provided in the Contract <br />Documents. When special makes or grades of material which are normally packaged by <br />the supplier or manufacturer are specified or approved, such materials shall be delivered to <br />the Project site in their original packages or containers with seals unbroken and labels <br />intact. <br />Materials shall be so stored as to assure the preservation of their quantity, quality and <br />fitness for the Work. Stored materials, even though approved before storage, may again be <br />inspected by the CMAR, the Designer or the Owner prior to their use in the Work and shall <br />be required to meet the requirements of the Contract Documents at the time they are <br />incorporated into the Work. Stored materials shall be located so as to facilitate their prompt <br />inspection. The Contractor shall coordinate the storage of all materials with the CMAR. <br />Materials to be stored at the Project or on the Owner's property shall not create an <br />obstruction to the Owner's or other contractor's reasonable activities. Private property shall <br />not be used for storage purposes without written approvals consistent with the provisions of <br />paragraph 20.3 of these General Conditions. The Contractor shall make all arrangements <br />and bear all expenses for the storage of materials on private property. Upon request, the <br />Contractor shall furnish the CMAR a copy of the property owner's permission. All storage <br />sites on private or the Owner's property shall be restored to their original condition by the <br />Contractor at its entire expense, except as otherwise agreed to (in writing) by the owner or <br />lessee of the property. <br />7.7 All materials and equipment shall be applied, installed, connected, erected, used, cleaned <br />and conditioned in accordance with the instructions of the applicable manufacturer, <br />fabricator, or processor, except as otherwise provided in the Contract Documents. <br />7.8 The Contractor will be fully responsible for all acts and omissions of its Subcontractors and <br />of persons directly or indirectly employed by them and of persons for whose acts any of <br />them may be liable to the same extent that the Contractor is responsible for the acts and <br />omissions of the Contractor's own employees. Nothing in the Contract Documents shall <br />create any contractual relationship between any Subcontractor or supplier and the CMAR, <br />the Owner or the Designer, or any obligation on the part of the CMAR, the Owner or the <br />Designer to pay or see to the payment of any money due any such Subcontractor or <br />material furnisher except as may otherwise be required by law. The CMAR may furnish to <br />any Subcontractor or supplier, to the extent practicable, evidence of amounts paid to the <br />Contractor on account of specific Work done. <br />7.9 The divisions and sections of the Specifications and the identifications of any Drawings <br />shall not control the Contractor in dividing the Work among Subcontractors. <br />7.10 The Contractor agrees to bind specifically every Subcontractor to the terms and conditions <br />of the Contract Documents for the benefit of the CMAR and to furnish written evidence <br />thereof to the CMAR within seven (7) days after written request by the CMAR. <br />7.11 The Contractor shall attend job progress conferences and all other meetings or <br />conferences as directed by the CMAR. The Contractor shall be represented at these job <br />progress conferences by a representative having the authority of the Project Manager and <br />by such other representatives as the CMAR may direct. Job progress conferences shall be <br />open to Subcontractors, suppliers and any others who may contribute beneficially toward <br />maintaining required job progress, and such personnel shall be encouraged by the <br />Contractor to attend. It shall be the principal purpose of job progress conferences to effect <br />coordination, cooperation and assistance in every practical way toward the end of <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 19 of 42 JUNE 2007 EDITION
The URL can be used to link to this page
Your browser does not support the video tag.