6.4 Review of submittals by the CMAR and the Designer shall not be construed as relieving the <br />Contractor from responsibility for compliance with terms or designs of the Contract <br />Documents nor from responsibility for errors of any sort in the submittal. <br />6.5 The Contractor shall keep one record copy marked "As-Built' of all Specifications, <br />Drawings, Addenda, Modifications, and Submittals at the Project in good order and <br />annotated at least monthly to show all changes made during the construction process. <br />Such monthly annotations and their approval by the CMAR shall be a condition precedent <br />to approval by the CMAR of each monthly Request for Payment. Said record copy shall be <br />stored at the Project and fully protected from damage by fire or other hazard. This record <br />copy shall be available.to the CMAR, the Designer and the Owner for inspection at all <br />times. The complete record copy shall be delivered to the CMAR for review and transmittal <br />to the Designer for the Owner's purposes prior to the Designer's certifying Substantial <br />Completion of the Work. <br />6.6 At completion of the Project and before Final Payment, the Contractor shall assemble and <br />deliver to the CMAR one complete set of all as-built drawings and one complete set of all <br />approved submittals, product data, and samples which were reviewed by the Designer. <br />These drawings and submittals shall be on paper, or in electronic or other media if required <br />by the Supplementary Conditions. These drawings and submittals shall be categorized <br />and packaged as directed by the Designer. <br />ARTICLE 7. CONTRACTOR <br />7.1 The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br />skill and attention. Except as may be set forth specifically in the Contract Documents, the <br />Contractor shall be solely responsible for the means, methods, techniques, sequences, and <br />procedures of construction, and for safety precautions and programs in connection with the <br />Work. The Contractor shall be responsible to see that the finished Work complies <br />accurately with the Contract Documents. <br />7.2 The Contractor shall appoint a competent Project Manager with general authority to <br />manage the Project for the Contractor. The Contractor also shall keep on the Project at all <br />times during the Work of the Contractor a competent Resident Superintendent and <br />necessary assistants who shall not be replaced without prior written approval by the CMAR <br />except under extraordinary circumstances, in which event immediate written notice shall be <br />given to the CMAR. If approved by the CMAR, taking into account the scope and <br />complexity of the Work of the Contractor, the Project Manager and the Resident <br />Superintendent may be the same person. At any time, the CMAR, in its sole and absolute <br />discretion, may require the Contractor to replace the Project Manager or Resident <br />Superintendent with an experienced and competent person or, persons upon seven (7) <br />days written notice from the CMAR to the Contractor. Such replacement shall be at the <br />Contractor's expense and at no cost to the CMAR. <br />Both the Project Manager and the Resident Superintendent shall have authority to act on <br />behalf of the Contractor, and instructions, directions or notices given to either of them shall <br />be as binding as if given to the Contractor. <br />7.3 The Contractor shall provide sufficient competent and suitably qualified personnel, <br />equipment, and supplies to lay out the Work and perform construction as required by the <br />Contract Documents. The Contractor will at all times maintain good discipline and order at <br />the site, and will comply with all applicable OSHA standards. <br />Any person employed by the Contractor, by any Subcontractor, or by any sub- <br />subcontractor who, in the opinion of the CMAR, the Designer or the Owner, does not <br />perform its Work in a proper and skillful manner or is intemperate or disorderly shall, at the <br />GENERAL CONDITIONS FOR CM AT RISK PROJECT 17 of 42 JUNE 2007 EDITION